
20
2. Use four sets of 5mm x 16mm screws with washer to install the body
hooks onto the hood (See figure 2).
3. Install the duct set using six 4mm x 16mm screw (See figure 3).
DUCTED INSTALLATION METHOD (vented to the outside)
4. Find an optimal location for the duct cover’s fix panel. The fix panel
must be placed directly above and align with the two body hooks. Drill
two more holes insert two toggle bolts. Secure the fix panel with 2
toggle bolts and screw tightly. Be sure to use appropriate anchors for
your wall. (figure 4)
(Fig. 6)
Lower
duct cover
Upper
duct cover
Duct cover's fix panel
」X
4 x 8 screw
」X
4 x 8 screw
(Fig. 4)
Hanging
on
1/4
"
aw
ay
fro
m
the
w
all
Body of Hood
11-13/32" 31/32"
Ceiling
Toggle Bolts
Wall
Duct Cover's
fix panel
1/8"
(Fig. 5)
Install the Duct set
and Aluminium tube
on the body of hood.
WARNING
Because of the weight and size of the range hood,
two or more people are needed to move and safely
install the range hood. Failure to properly lift range
hood could result in damage to the product or
personal injury. Hood may have very shape edges.
Please wear protective gloves if it is necessary to
remove any parts for installing.
PERSONAL INJURY HAZARD