Copyright © 2013 NEXCOM International Co., Ltd. All Rights Reserved.
50
NISE 90 User Manual
Appendix A: Power Consumption
Power Consumption Management
Purpose
The purpose of the power consumption test is to verify the power dissipation
of system, and the loading of power supply.
Test Equipment
PROVA CM-07 AC/DC CLAMP METER
Device Under Test
DUT: sys#1/
Test Procedure
1. Power up the DUT, boot into Windows XP
2. Entering standby mode (HDD power down)
3. Measure the power consumption and record it.
4. Run Burn-in test program to apply 100% full loading
5. Measure the power consumption and record it.
Test Data
Sys #1
+24V
Full-Loading Mode
1.42A
Total
17.04W
Standby S1 Mode
N/A
Total
N/A