Preparation
6. Kickboard Installation
Preparation
TIPS - End Panel & Filler Panels
End Panels
:
1. Once cabinets are in place and level, attach your end
panels to any exposed cabinet ends (use a filler panel if
going between cabinet and wall).
2. Hold end panel in place with clamps.
3. Using 28mm Hospa screws (supplied) join panel by
screwing into the pre-drilled holes (make sure you get the
front and back holes).
Note
•
Ensure all pre-drilled holes are used
•
Be mindful to allow extra for push to open doors
Filler Panels:
1. Between the cabinet and wall, set filler strip.
2. Your filler panel is 100mm x 16mm, so you may need to plane
the filler panel to fit/fill depending how big the gap is or due to
walls not being plumb.
3. Using 28mm Hospa screws (supplied), secure filler panel
through the pre-drilled holes inside the cabinet.
Note
•
Ensure all pre-drilled holes are used
•
Be mindful to allow extra for push to open doors
1. SILICONE CARCASS ENDS
1.
Push kickboard firmly in place.
2. Seal kickboard at bottom edge with silicon, to prevent water
penetration from occuring. Allow to set for 24hrs.
Note: You may need to plane some material off the kickboard to fit if your
floor is uneven.
Apply non-acidic silicone to face of carcass ends (where the kickboard will
be placed).
2. SECURE KICKBOARD
End Panel
End Panel
End Panel
End Panel
Filler Panel
End Panel
(Used as filler)
Filler Panel
8
|
Laundry Collection by Newtech
www.newtech.co.nz