background image

2

Note: Illustrations not to scale

Use screwdriver to guide tabs into slot  

if necessary

 

1

 

3

 

2

 

1

 

2

1.

  Slot first short beam into post. Tap into place with

 rubber mallet

2.

  

Assemble end frames with short side beams & join with            

     long front & back beams

P

O

One set of 6 Bay Connectors joins 2 bays side 

by side or back to back for added stability

Bay Connectors

Code BC16

4.

  Repeat steps 2-3 to add

remaining level & insert

chipboard decks

 

1

 

2

 

3

 

4

 

5

 

6

ACCESSORIES ALSO AVAILABLE

HOW TO FIT BAY CONNECTORS

 

1

 

2

Bays connected  

side by side

5.

  Push plastic protective

feet onto each post

3.

  Bend centre support ends at right angles. Slot into

 front & back beams.

Bend ends over with  

screwdriver to hold 

support in place

 

a

 

b

 

c

 

d

90°

180°

Bend tab to

P

 

e

 

f

 

g

 

3

We recommend 

fixing to a wall 

for maximum 

stability

!

LOADING CHART

Max load

Weight in kilograms

Per shelf

175KG UDL

Per bay

350KG UDL

All weight loadings relate to UDL (uniformly distributed loads).

The load capacity will be reduced if the shelves are loaded unevenly.

 Light Duty Workbench Assembly

Reviews: