
Installation
PAM.E4 manual
15
4.5
Connecting mains supply line (Power)
►
Connect the supplied power supply cable to a 24 V DC source at the control cabinet and connect to
the PAM.E4.
►
Depending on the configuration, connect the mains cable in the control cabinet or plug in the mains
plug.
►
Plug in the DC plug at the DC port on the rear side of the PAM.E4.
►
Press the ON/OFF button.
Control cabinet 24 VDC
ON / OFF
4.6
Checking status of connection
►
Watch the LEDs on the front side of the PAM.E4:
•
The
Power ON
LED must light up green.
•
When an LTE antenna is connected, the
LTE
LED must light up green.
•
As soon as the connection to the E4 is set up, the
Cloud
LED lights up for approx. one minute.
1 2 3
1
LED – power ON
3
LED – E4 cloud connection
present
2
LED – LTE connection present
In the event of connection problems: See „7 FAQ“ on page 38 .