Newgrind Rhino RM250 Operator'S Manual Download Page 10

ing charge, plus a charge back for 

outbound freight charges if the original 

order was shipped prepaid. Returns are 

not accepted for any Products that are 

specifically manufactured to meet the 

buyer’s requirement of either specifica-

tions or quantity.

AGREEMENTS
These Terms and Conditions constitute the 

entire agreement between Seller and 

Purchaser as it relates to terms and condi-

tions of sale, and supersedes any and all 

prior oral or written agreements, 

correspondence, quotations or under-

standings heretofore in force between the 

parties relating to the subject matter 

hereof. There are no agreements between 

Seller and Purchaser with respect to the 

Product herein except those specifically 

set forth in and made part of these terms 

and conditions. Any additional terms, 

conditions and/or prices are rejected by 

Seller. These terms and conditions may be 

modified, cancelled or rescinded only by a 

written agreement of both parties execut-

ed by their duly authorized agents.

New Grind Inc.

103B- 81 Golden Dr 

Coquitlam

 BC

V3K 6R2

Telephone: 

1-888-467-0242

 

carissa

@newgrind.com 

www.newgrind.com

Summary of Contents for Rhino RM250

Page 1: ...RhinoResurfacing Machine Operator s Manual RS150 1 5HP RM250 3HP...

Page 2: ...For your personal safety READ and UNDERSTAND before using SAVE THESE INSTRUCTIONS FOR FUTURE REFERENCE...

Page 3: ...nvites accidents Personal Safety 7 Stay alert watch what you are doing and use common sense when operating equipment Do not use equipment while tired or under the influence of drugs alcohol or medicat...

Page 4: ...use 12 gauge cord or larger If in doubt use the next heavier gauge The smaller the gauge number the heavier the cord SPECIFIC SAFETY RULES DO NOT let comfort or familiarity with product gained from re...

Page 5: ...right side of the handle control box to adjust speed of equipment Before starting the equipment ensure that the speed is set to the lowest speed available as displayed on the VFD screen Doing so will...

Page 6: ...ush This will ensure maximum adhesion Check that the handle bolts are tight Vacuum or wipe underside of machine Inspect plug ends for signs of carbon deposits or arcing Check all fasteners and tighten...

Page 7: ...g but not limited to engines motors electrical components transmissions etc shall carry the accesso ry manufacturers own warranty New Grind Inc will at its option repair or replace at the New Grind In...

Page 8: ...conditions pursu ant to which the purchaser Purchaser will purchase and New Grind Inc Seller will sell the products accessories attach ments collectively the products ordered by the Purchaser These t...

Page 9: ...ss or damage during shipment are to be filed with carrier by the Purchaser Seller will not assume responsibility for the performance of the carrier Backorders will be shipped in the most practical fas...

Page 10: ...agreements correspondence quotations or under standings heretofore in force between the parties relating to the subject matter hereof There are no agreements between Seller and Purchaser with respect...

Page 11: ...www newgrind com...

Page 12: ...SV01C Operating Instructions SMVector Frequency Inverter...

Page 13: ...le parameter version d Dynamic Braking fault Dynamic braking resistors are overheating Increase active decel time P105 P126 P127 Check mains voltage and P107 External fault P121 P123 21 and that digit...

Page 14: ...r to performing the Motor Auto calibration See P300 P399 for Drive Mode setup and calibration Module communication fault Communication failure between drive and Network Module Check module connections...

Page 15: ...mpt P110 5 or 6 Check motor load Single Phase fault A mains phase has been lost Check mains voltage Start fault Start command was present when power was applied P110 0 or 2 Must wait at least 2 second...

Page 16: ...AC Technology Corporation 630 Douglas Street Uxbridge MA 01569 USA 1 508 278 9100 SV01C...

Reviews: