VII. System Start-up
A.
Always Inspect Installation Before Starting Burner.
B
.
Fill Heating System with Water.
Refer to Section III,
G.
C.
Check controls, wiring and burner
to be sure that
all connections are tight and burner is rigid, that all
electrical connections have been completed and fuses
installed, and that oil tank is fi lled and oil lines have
been tested.
D
.
Lubrication
— Follow instruction on burner and
circulator label to lubricate, if oil lubricated. Most
motors currently used on residential type burners
employ permanently lubricated bearings and thus do
not require any fi eld lubrication. Water lubricated
circulators do not need fi eld lubrication.
Do not over-lubricate. This can cause as much trouble
as no lubrication at all.
E
.
Set controls
with burner service switch turned “OFF”.
1. SET ROOM THERMOSTAT about 10° above
room temperature.
2. PRESS RED RESET BUTTON on R7184P Oil
Primary Control and release.
3. Set high limit dial on L8148 at temperature to suit
requirements of installation.
F
.
Burner Start-Up
G
N
I
N
R
A
W
n
e
h
w
r
e
n
r
u
b
e
h
t
t
r
a
t
s
o
t
t
p
m
e
t
t
a
t
o
n
o
D
,
r
e
b
m
a
h
c
e
h
t
n
i
d
e
t
a
l
u
m
u
c
c
a
s
a
h
l
i
o
s
s
e
c
x
e
n
e
h
w
r
o
r
o
p
a
v
f
o
l
l
u
f
s
i
r
e
l
i
o
b
n
e
h
w
.
t
o
h
y
r
e
v
s
i
r
e
b
m
a
h
c
n
o
i
t
s
u
b
m
o
c
1. VERIFY burner settings.
a. Refer to Table 4.
2. Open all shut-off valves in the oil supply line to the
burner.
3. Attach a plastic hose to fuel pump vent fi tting and
provide a container to catch the oil.
4. REMOVE GAUGE PORT PLUG from fuel pump
and install pressure gauge.
5. REMOVE TEST PLUG IN FLUE COLLAR.
6. Close the service switch to start the burner. If the
burner does not start immediately, check the manual
overload switch on the motor, if so equipped, and
the safety switch of the burner primary control.
G
N
I
N
R
A
W
e
l
o
h
t
h
g
i
s
f
o
t
u
o
e
m
o
c
s
e
s
a
g
e
u
l
f
t
o
h
y
r
e
V
g
u
l
p
t
h
g
i
s
t
u
o
h
t
i
w
d
e
t
a
r
e
p
o
s
i
r
e
l
i
o
b
n
e
h
w
e
y
e
r
e
p
o
r
p
r
a
e
w
s
y
a
w
l
A
.
d
e
l
l
a
t
s
n
i
.
n
o
i
t
c
e
t
o
r
p
G
N
I
N
R
A
W
e
r
e
v
e
s
e
s
u
a
c
n
a
c
h
c
i
h
w
d
r
a
z
a
h
l
a
i
t
n
e
t
o
p
a
e
v
a
h
r
o
o
d
g
n
i
w
s
r
e
n
r
u
b
h
t
i
w
d
e
p
p
i
u
q
e
s
r
e
l
i
o
b
l
l
A
f
f
o
n
r
u
t
,
r
o
o
d
g
n
i
w
s
g
n
i
n
e
p
o
e
r
o
f
e
B
.
d
e
r
o
n
g
i
f
i
e
f
i
l
f
o
s
s
o
l
r
o
y
r
u
j
n
i
l
a
n
o
s
r
e
p
,
e
g
a
m
a
d
y
t
r
e
p
o
r
p
.
r
e
b
m
a
h
c
n
o
i
t
s
u
b
m
o
c
e
h
t
e
d
i
s
t
u
o
r
e
n
r
u
b
f
o
g
n
i
r
i
f
l
a
t
n
e
d
i
c
c
a
t
n
e
v
e
r
p
o
t
r
e
l
i
o
b
o
t
h
c
t
i
w
s
e
c
i
v
r
e
s
.
d
e
t
e
l
p
m
o
c
s
i
e
c
i
v
r
e
s
n
e
h
w
y
l
e
t
e
l
p
m
o
c
r
e
n
e
t
s
a
f
r
o
o
d
g
n
i
w
s
n
e
t
h
g
i
t
o
t
e
r
u
s
e
B
R
E
N
R
U
B
I
I
F
A
T
T
E
K
C
E
B
:
4
E
L
B
A
T
l
e
d
o
M
r
e
l
i
o
B
g
n
i
r
i
F
e
t
a
R
)
H
P
G
(
r
e
n
r
u
B
e
b
u
T
r
i
A
n
o
i
t
a
n
i
b
m
o
C
e
l
z
z
o
N
n
a
v
a
l
e
D
s
g
n
i
t
t
e
S
r
i
A
d
a
e
H
)
w
e
r
c
s
p
o
t
s
(
e
r
u
s
s
e
r
P
p
m
u
P
)
G
I
S
P
(
K
E
T
o
r
c
i
m
1
V
D
0
6
.
0
5
8
I
I
F
A
D
H
0
5
X
L
H
B
°
0
7
x
0
5
.
0
5
.
2
2
#
0
4
1
K
E
T
o
r
c
i
m
2
V
D
0
0
.
1
0
5
1
I
I
F
A
E
H
0
5
X
L
H
B
°
0
6
x
5
8
.
0
5
.
3
3
#
0
4
1
K
E
T
o
r
c
i
m
3
V
D
5
2
.
1
0
5
1
I
I
F
A
E
H
0
5
X
L
H
B
°
0
6
x
0
0
.
1
0
.
4
5
#
0
4
1
Summary of Contents for microTEKDV
Page 14: ...14 Figure 10 Vent Installation Figure 11 Vent Connector Un Assembled ...
Page 15: ...15 Figure 13 Air Intake Installation Figure 12 Vent Connector Assembled ...
Page 19: ...19 Figure 15 Schematic Wiring Diagram ...
Page 30: ...30 Figure 20 microTEKDV Boiler Jacket Insulation ...
Page 31: ...31 Figure 21 microTEKDV Bare Boiler Assembly ...