![New Leader Guardian L3030G4 MultApplier Operator'S Manual Download Page 28](http://html1.mh-extra.com/html/new-leader/guardian-l3030g4-multapplier/guardian-l3030g4-multapplier_operators-manual_1677944028.webp)
- 28 -
www.NewLeader.com
(800) 363-1771
307369-AA-G
L3030G4 CNH
Header
Recommended sequence of installation is:
1. Spreader
preparation.
2. Insert
preparation.
3.
Mounting of insert.
4.
Connecting hydraulic hoses.
5.
Installation of hillside divider and conveyor cover.
6. Checking
installation.
7.
Checking for leaks and proper functioning.
SPREADER PREPARATION
WARNING
Use only lifting devices that meet or exceed OSHA standard 1910.184. Never exceed
work load limits or lift equipment over people. Empty spreader before lifting. Loads
may shift or fall if improperly supported, causing injury.
Figure 1
Remove the Inverted “V” and Hillside Divider from
the spreader, if so equipped, and set hardware
aside.
Remove Feedgate Jack Handle and set aside.
Support endgate by attaching a hoist to the lift
hooks. Remove hardware from both sides of the
endgate and carefully remove from the spreader as
shown in Figure 1.
NOTE: Always use a sling, spreader bar, or
lifting bar that attaches to the lifting points with
a minimum of 60 degrees from horizontal. It is
preferable to use a straight style lifting bar that
keeps the attaching chains in a near vertical
orientation.
NOTE: Always inspect unit lift hooks for signs of
wear, cracking, corrosion, gouges, alterations, or
distortion before use.
Insert Installation