Carefully stand the planter box on it’s legs and insert the two floor
supports into place as shown.
The Urbanscape Raised Planter Box
4
Lay down one of the pre-assembled side panel with post down
and insert the bottom shelft as well as the two front and back
panels. Push the bottom shelf until the tabs lock into place.
Align and insert the second pre-assembled side panel as shown.
Push down until the bottom shelf rail tabs lock into place.
3
2
2
S T E P O N E
Insert the seven Shelf Boards into the Shelf Rails as shown aside
Note that there are tabs located at the ends of the Shelf Boards.
Push Shelf Boards until tabs are locked into place.
1
The Urbanscape Raised Planter Box
www.newenglandarbors.com
www.newenglandarbors.co.uk
4
2
3
1