
Side Panel Trellis Assembly
7
Biltmore Pergola
One by one, insert five Middle Trellis Horizontal Rails over the
Trellis vertical Slat as shown. Excess force should not be used.
Slide the End Trellis Horizontal Rails over the assembly as
shown. Note that there are only one side with a routed hole.
Starting with one end, carefully ‘walk’ the assembly into the
Trellis Post while making adjustments.
Note that the horizontal rails are tabbed; once inserted, the
horizontal rails will lock into place.
Starting with one end, carefully ‘walk’ a Trellis Post over the
assembly as shown.
Pressure fit four end caps as shown.
Repeat for other 7 side panel trellisses.
1
2
4
STEP ONE
5
6
3
Pergola Assembly
1
2
3
5
4
6
x 8
www.newenglandarbors.com