New England Arbors The Trellis Assembly Instructions Download Page 4

4

STEP THREE

Insert the ground anchoring stakes into the 

b

ottom of the trellis

posts.  Secure with screws as shown aside.

Mounting Into the Ground 

Install the Ground Anchor Stakes

 

3

Trellises must be well secured in the event of high winds, etc.  We 
have provided two ground anchoring stakes  for  securing  the  trellis
either  into   the   ground  or   into  a   concrete   footing.    If you are 
installing your trellis directly to the wall of your home, or on a wood deck 
or concrete surface, please see your hardware store for the appropriate 
galvanized bracket hardware.

STEP FOUR

M

ove the trellis to its final location.  

W

hen you are satisfied with

the location

,

 mark the positions of the posts

,

 then move the trellis

aside and lay it carefully on it

s side.  E

x

cavate the 2 post holes

appro

xim

at

ely 22" deep x 6" diame

ter.  Carefully move the trellis

back i

nto position.

L

evel it 

b

oth vertically and horizontally into the e

x

cavated holes.

Backfill the holes with the e

x

cavated soil.

Note:

 For a stronger installation

,

 purchase two 2

x

4 pressure

treated lum

b

ers and sleeve them into the posts. 

W

ood posts

should 

b

e inserted 4” into the trellis posts and ±24” into the

ground.  

Install Trellis into Ground

4

C

A

4

22”

L

evel

6“

B

Reviews: