New England Arbors The Devonshire Arbor Assembly Instructions Manual Download Page 2

STEP ONE

2

L

ay down one of the post on its side as shown and insert

the 4x4 Pressure Treated 

L

umber 

60”

 into the post (

36” 

out).  

Mount the 2 x 3 1/2 and 1 3/4 x 1 3/4 Brackets onto the post at

10 7/8“ 

and 51 1/2” respectively from the bottom of the post*.

Use the provid

ed 3“ 

Screws (2 per bracket).

Ensure the opening of the 2 x 3 1/2  bracket is facing up.

*) Note: Measurements are from the bottom of the post to the
bottom of each bracket.

The Devonshire Arbor

Assemble the Posts

1

2

www.newenglandarbors.com

1

51 1/2”

10 7/8”

36”

2

2

Bottom View of Post

Bracket

3” Screws

Vinyl

Post

W

ood

Post

Repeat for all four posts. Note the location of the wood posts
as they should be symmetrical and opposite to each other.
Consult the below diagram for reference.  

3

Summary of Contents for The Devonshire Arbor

Page 1: ...Stainless Steel Screws 36 20 Tubes of Vinyl Glue 2 Material You Will Need Not Included 4 in x 4 in x 8 ft Pressure Treated Lumber 4 Tools You Will Need Hammer Tape Measure Level Stool or Short Ladder Shovel or Auger Cordless Drill General Information Read Instructions through carefully before beginning assembly When assembling components place on a non abrasive surface i e shipping box to avoid sc...

Page 2: ...Screws 2 per bracket Ensure the opening of the 2 x 3 1 2 bracket is facing up Note Measurements are from the bottom of the post to the bottom of each bracket The Devonshire Arbor Assemble the Posts 1 2 www newenglandarbors com 1 51 1 2 10 7 8 36 2 2 Bottom View of Post Bracket 3 Screws Vinyl Post Wood Post Repeat for all four posts Note the location of the wood posts as they should be symmetrical ...

Page 3: ...ate the side panel assembly on top of a post as shown below Assemble by firstly inserting the Top Arch Rail into the routed hole followed by the middle rail and bottom rail Fasten the rails into its corresponding bracket using the 3 4 screws provided 2 screws per bracket as shown 2 3 3 2 insert 1st insert 2nd insert 3rd Lay down a second post align and insert the panel from the previous step follo...

Page 4: ...s 1 2 www newenglandarbors com 1 3 4 The Devonshire Arbor 4 2 Using eight of the 3 4 screws provided fasten the arches on all four sides through the pre drilled holes Take the keystone base and top and connect them over the middle of the arch as shown Make sure the pins in the base are correctly inserted into the holes in the top Push the two pieces together No glue is required for this step 3 4 5...

Page 5: ...t for the remaining filters Assemble the Arches 7 7 8 8 Fasten the filters in place using two 3 screws per rafter as shown Run a small bead of glue around the inside lip of the rafter end cap Press the cap firmly onto the end of the filter and hold in place for a few seconds Repeat this step for each end cap Note Allow 10 minutes for the vinyl glue to set before lifting or moving the arch assembly...

Page 6: ...cation of the arbor and Excavate four holes approx 36 in 91 4 cm deep 12 in in diameter The spacing of the holes should be as per image aside Carefully move the side panels into the excavated holes Run a 2 3 long bead of glue on the ribbed flanged of the arch couplers as shown STEP FIVE Install The Arbor 2 3 2 3 Into Earth with Concrete Footing Arbors must be well secured to prevent tipping over f...

Page 7: ...de panel posts You will need a helper Run a bead of glue around the post just under the arches Slide the post trims up and hold them in place momentarily to allow the glue to set Fasten four 1 1 2in screws into each side of the post just below the post trim Level the arbor both horizontal and vertically Backfill the holes with either gravel or cement 6 5 9 9 7 ...

Reviews: