background image

Draft. Nr.: BDA 386 

      

Update:  13.09.2016

      

Data subject to change without prior notice.  2016  NEUTRIK  . ALL RIGHTS RESERVED. NEUTRIK  are registered trademark.

I

I

®

®

©

ASSEMBLY INSTRUCTION

  

ultimatePLUG

I  

G

ultimate

PLUG

1.

2.

ultimate

PLUG

1.

2.

H

ultimate

PLUG

Position the chuck on to the cable and move 
it into the housing.

Attention: Pay attention to the guiding key of 
the chuck.

Finish the installation by tighten the bushing 
onto the connector.

FINISH

Page 2

NEUTRIK

  

AG 

LI 

T: 

+423

 

/

 

237

 

24

 

24 

F: 

+423

 

/

 

232 53 93

NEUTRIK

  

USA Inc. 

USA 

T: 

+1

 

704

 

/

 

972 3050 

F: 

+1

 

704

 

/

 

438 9202

(

)

NEUTRIK

  

UK  Ltd. 

UK 

T: 

+44

 

1983

 

/

 

811

 

441 

F: 

+44

 

1983

 

/

 

811

 

439

NEUTRIK 

Vertriebs

 

GmbH

 

DE

 

/

 

NL

 

/

 

AT/DK 

T: 

+49

 

8131

 

/

 

280

 

890 

F: 

+49

 

8131

 

/

 

280

 

830

NEUTRIK France 

FR 

T: 

+33 1

 

/

 

4131 6750 

F: 

+33 1

 

/

 

4131 0511

NEUTRIK Tokyo Ltd. 

JP 

T: 

+81 3

 

/

 

3663 4733 

F: 

+81 3

 

/

 

3663 4796

NEUTRIK 

Hong Kong Ltd.

 

HK 

T: 

+852

 

/

 

2687 6055 

F: 

+852

 

/

 

2687 6052

NEUTRIK India Pvt. Ltd. 

IND 

T: 

+91

 

/

 

982 05 43 424 

F: 

+91

 

/

 

22 26163 540

www.neutrik.com

Reviews: