U
ser
M
anUal
Page 10 of 16
DF-150 User Manual | Rev 1.0
Netzer Precision Motion Sensors LTD Propriety
Preface
Safety
Product Overview
Unpacking
Electrical
Connection
Software
Installation
Mounting
Verification
Calibration
Mechanical ICD
Mounting options
JUNE 2016
All specifications are subject to change without notice
Contents
DF-150 Rotary Electric Encoder
7.
MOUNTING VERIFICATION
Perform mounting verification before calibration to ensure optimal
performance by selecting [Verification] on the main screen of the
Encoder Explorer or by using the signal analyzer under “Tools.”
7.1 s
TarTing
The
e
nCoder
e
xplorer
Make sure to complete the following tasks successfully:
■
Mechanical Mounting
■
Electrical Connection
■
Connecting Encoder for Calibration
■
Encoder Explore Software Installation
Run the Electric Encoder Explorer tool (EEE).
Ensure proper communication with the encoder:
(
a
) The status bar indicates successful communication.
(
b
) Encoder data displays in the Encoder data area. (CAT No., serial No.)
(
c
) The position dial display responds to shaft rotation.
7.2 m
eChaniCal
i
nsTallaTion
V
erifiCaTion
The Mechanical Installation Verification provides procedures to
ensure proper mechanical mounting by collecting raw data of
the coarse and fine channels during rotation.
(
d
) Select [Mechanical Mounting Verification] on the main
screen.