Chapter 3 installation and debugging
Content
open-case inspection
installation
start test
Main content: Introduce common operations of installation and debugging of
NETCOM POE series
3.1 Open case inspection
Check the attachment whether complete, it contains:
1.
POE device
A user’s manual
An input power cable
48V Power adaptor(POE04 only)
2. Checking the machine whether damaged, deformed or rusty.
If it is found that the sorts of equipment components or the
quantities does not consistent with the description, or equipment
is damaged in transit, etc., Please contact us in time.
3.2 Installation
(1) Power cord be plugged into 220VAC input socket.
(2) Connecting up the output signal wire individually. (Picture 2-4).
(3) AC power cord, signal wire, the output line be connected fastened,
in order to avoid poor contact and loose.
Notice
: