Netberg Demos R130 M2 server
8
1.5. About the Server
1.5.1. Introduction
This manual is written for system technicians who are responsible for troubleshooting, upgrading,
and repairing the server chassis. This document provides an overview of the hardware features of
the chassis, troubleshooting information, and instructions on how to add and replace components
of the server. The document also provides information on the BIOS, and Baseboard Management
Controller (BMC).
For the latest version of this manual, see [email protected] [mailto:[email protected]].
System Features
• Chipset: Intel® C610 (Wellsburg)
• Processor: (2x) Intel® Xeon® E5-2600 v3 series processors
• PCI-E:
• (1) PCIe x16 v3 slot
• (1) PCIe x8 v3 OCP Mezzanine slot
• (1) PCIe x8 v3 SAS/RAID Mezzanine slot.
• Memory: Up to twenty-four DIMM slots available. DDR4 1333/1600/1866/2100 MHz ECC
UDIMM/RDIMM/LRDIMM is supported
• Storage:
• Up to four 3.5" SATA/SAS hot-plug drives or ten 2.5" SATA/SAS hot-plug drives including 2
NVMe PCIe SSD.
• As an option, two SATADOM
• Network:
• (2) Intel Powerville I350 GbE RJ45 ports or (2) Intel Twinville X540 10G BASE-T RJ45 ports
• (1) GbE dedicate management port
• OCP mezzanine card (optional): (2) GbE BASE-T or (2) 10G BASE-T or (2) 10G SFP+ or (1)
40G QSFP+ ports
Expansion cards are optional components.
Table 1.1. System specifications
Chassis type
1U chassis
Size (W x H x D)
438 mm x 43.2 mm x 742 mm
Summary of Contents for Demos R130 M2
Page 1: ...Netberg Demos R130 M2 server...
Page 2: ...Netberg Demos R130 M2 server...
Page 11: ...Netberg Demos R130 M2 server xi 9 5 Aligning the Rails 222...
Page 14: ...1 Chapter 1 Netberg Demos R130 M2 server...
Page 31: ...Netberg Demos R130 M2 server 18 On HDD failure HDD Fault Amber Off No failure detected...
Page 32: ...19 Chapter 2 Installing hardware...
Page 57: ...Installing hardware 44 Figure 2 36 Installing the Air Duct...
Page 60: ...Installing hardware 47 Figure 2 40 Connecting the Fan Assembly Cables...
Page 143: ...130 Chapter 6 Server Management Software...
Page 169: ...156 Chapter 8 Web Graphical User Interface GUI for ESMS...
Page 230: ...217 Chapter 9 Rail Kit Assembly...
Page 236: ...223 Chapter 10 Troubleshooting...