background image

STOP HERE. 

If you have NO external storage, skip to section 4, complete system setup and configuration. 

IOM12

2

1

LN K

LN K

4

3

LN K

LN K

IOM12

2

1

LN K

LN K

4

3

LN K

LN K

IOM12

2

1

LN K

LN K

4

3

LN K

LN K

IOM12

2

1

LN K

LN K

4

3

LN K

LN K

IOM12

2

1

LN K

LN K

4

3

LN K

LN K

IOM12

2

1

LN K

LN K

4

3

LN K

LN K

1

2

AC

AC

1

2

AC

AC

1

2

AC

AC

1

2

AC

AC

Dual controller system

IOM12

2

1

LN K

LN K

4

3

LN K

LN K

IOM12

2

1

LN K

LN K

4

3

LN K

LN K

IOM12

2

1

LN K

LN K

4

3

LN K

LN K

IOM12

2

1

LN K

LN K

4

3

LN K

LN K

IOM12

2

1

LN K

LN K

4

3

LN K

LN K

IOM12

2

1

LN K

LN K

4

3

LN K

LN K

1

2

AC

AC

1

2

AC

AC

1

2

AC

AC

1

2

AC

AC

Single controller system

Cabling a FAS26xx series with NO external storage

Cabling a FAS26xx series WITH external storage

(DS212C or DS224C disk shelves

)

Cable storage 

|

 Stage 

3  

(Choose option A or B below)

A

B

First

shelf

IOMA

IOMA

Last

shelf

First

shelf

Last

shelf

IOMB

IOMB

1

2

AC

AC

No additional cabling required for a single controller.

Single controller system

1

2

AC

AC

Dual controller system

Connect the SAS ports of both controllers:
• Controller 1 0a to Controller 2 0b
• Controller 1 0b to Controller 2 0a

Storage cables

2

1

3

Connect the shelf-to-shelf ports through each domain (IOM A and IOM B)
Connect each node to IOM A in the stack
Connect each node to IOM B in the stack

Storage cables

Summary of Contents for FAS26 Series

Page 1: ... X6554 R6 112 00189 or X6536 R6 112 00090 Data and cluster Interconnect cables 1 Go to mysupport netapp com and create an account register your system and get your license keys 2 Unpack all boxes and inventory contents 3 Go to the AFF and FAS System Documentation Center and click FAS26xx series and then Installation and Setup Download and complete the Cluster Configuration Worksheet Watch the vide...

Page 2: ...the wrench port to the management or subnet switch For option A only Connect port e0a to port e0a and port e0b to port e0b For option B only Connect port e0a and port e0b to the cluster switch Strap the cables to the cable management arms 5 1 2 3 4A 4B Install hardware Stage 2 1 2 Use retaining clips Use retaining clips LIFTING HAZARD CAUTION 26 kg 55 lbs Ethernet cables 10 GbE network cables PN 1...

Page 3: ... AC AC 1 2 AC AC 1 2 AC AC 1 2 AC AC Single controller system Cabling a FAS26xx series with NO external storage Cabling a FAS26xx series WITH external storage DS212C or DS224C disk shelves Cable storage Stage 3 Choose option A or B below A B First shelf IOMA IOMA Last shelf First shelf Last shelf IOMB IOMB 1 2 AC AC No additional cabling required for a single controller Single controller system 1 ...

Page 4: ...y cabled and then turn the power supplies Management subnet Laptop 3 Use System Manager Guided Setup to configure your cluster 4 Completing setup 1 Verify the health of your system by running Config Advisor 2 After you have completed the initial configuration go to the NetApp ONTAP Resources page for information about configuring additional features in ONTAP micro USB console cable Ethernet cable ...

Reviews: