220-0000006 rev02
Net to Net Technologies, Inc.
112 Corporate Drive Suite 1
Pease International Tradeport
Portsmouth, NH 03801
877.638.2638 www.nettonettech.com
AC Power Installations
An external power converter is required to power the IP DSLAMs. Follow the instructions included with the AC to DC
power converter you are using to power the IP DSLAM.
+ G
-
Installing Access and Uplink Modules
1. Ensure that proper grounding techniques are being used when installing modules into the IP DSLAM.
2. Align module with slot module guides and slide module gently but firmly all the way into the chassis.
3. Tighten screws on front of Module.
IP DSLAM Access Modules and fan trays are hot swappable; installing or removing an Access Module or Fan Tray
while the chassis is powered up does not affect the operational status of other Access Modules within the chassis.
There must be a Multiplexer Uplink Module installed in the IP DSLAM chassis in order for Access Modules to operate.
Once the Multiplexer Uplink Module and Access Modules have been installed, all configuration settings are software
selectable via the IP DSLAM Network Management System (NMS). For further instruction please refer to the IP
DSLAM NMS Users Guide. Information such as interface pin-outs and LED indications can be found in module specific
Users Guides.
CAUTION: To ensure proper cooling of the chassis, blanking plates must be left in any slots for which an
Access Module (or 2
nd
Multiplexer Uplink Module on the IPD12000) will not be installed.