4. INSTALLATION 

WARNING:

 

BE AWARE THAT INSTALLATION OF THIS EQUIPMENT INCLUDES RISK OF 

ELECTRIC SHOCK. NORMALLY GROUNDED CONDUCTORS MAY BE UNGROUNDED AND 

ENERGIZED WHEN A GROUND FAULT IS INDICATED.   

Parts Included   

In addi

on to the micro inverters, PV modules, racking, and associated hardware, 

you’ll need the BDM-250 installa

on kit. This kit includes the following items:   

Protec

�v

e end cap   

Moun

ng Bracket (adapter plate)   

AC interconnect cable and protec

�v

e end CAP   

Other Parts and T

oo

ls Required   

In addi

on to your PV array and its associated hardware, you will need the 

following parts:   

Junc

on box   

Con

nuous grounding conductor, grounding washers 

Number 2 Phillips screwdriver   

Sockets, wrenches for moun

ng hardware   

Torque wrench   

Moun

ng hardware suitable for module racking 

Lightning Surge Suppressi

o

n   

Lightning does not actually need to strike the equipment or building where PV 

system is installed to cause damage. O

en, a strike nearby will induce voltage 

spikes in the electrical grid that can damage equipment. BDM-250 has integrated 

surge protec

on, greater than most string inverters. However, if the surge has 

su

cient energy, the protec

on built into the BDM-250 can be exceeded, and 

the equipment can be damaged. 
Since the NEP Limited Warranty does not cover “acts of God” such as lightning 

strikes, and since lightning strikes can occur anywhere, it is best prac

ce to install 

surge protec

on as part of any solar installa

on. Installa

on of surge protec

on 

devices should follow vendor instruc

ons. 

Installa

�o

n Pr

o

cedure 

 

WARNING:

 

DO NOT CONNECT BDM-250 TO THE UTILITY GRID OR ENERGIZE THE AC 

CIRCUIT(S) UNTIL YOU HAVE COMPLETED ALL OF THE INSTALLATION PROCEDURES AS 

DESCRIBED IN THE FOLLOWING SECTIONS.   

Installing the BDM-250 Micro inverter System involves several key steps:   
1. Measuring service and installing the AC branch circuit junc

on box.   

WARNING: 

ONLY USE ELECTRICAL SYSTEM COMPONENTS APPROVED FOR WET 

LOCATIONS.   

2. A

aching the BDM-250 Micro inverter to the racking.   

3. Connec

ng the BDM-250 Micro inverter wiring harnesses.   

4. Grounding the system.   
5. Comple

ng the BDM-250 Micro inverter installa

on map and connec

ng the 

PV modules.   

The 

nished  system  should  be  similar  as  in  the  diagram.  Detailed  installa

on 

steps are listed in the following sec

on.   

 

Step 1 - Install the AC Branch Circuit Junc

�o

n B

o

x   

1. Measure service entrance conductors to con

rm AC service at the site. 

Acceptable ranges are shown in the table below: 

 BDM-250-240A & BDM-250-208A (North America)   

240 Volt AC Single Phase 

208 Volt AC Single Phase 

L1(red) to L2(black) 

211 to 264 Vac  L1(red) toL2(black)  183 to 229 Vac 

L1(red), L2(black) to 

neutral(blue) 

106 to 132 Vac  L1(red), L2(black) 

to neutral(blue) 

106 to 132 Vac 

 

05

04

Summary of Contents for BDM-250-208A

Page 1: ... 9 Meander Grove Cameron Park NSW2285 China Address No 1 Anhe Rd Tsingtao Export Processing Zone Tsingtao China 266113 TEL 86 532 87963900 FAX 86 532 81100917 SAA 122309 N136 BDM 250 240A BDM 250 AU BDM 250 LV BDM 250 208A BDM 250 EU Installa on and Opera on Manual ...

Page 2: ...ocedure Step 1 Install the AC Branch Circuit Junc on Box Step 2 A ach the BDM 250 to the Racking Step 3 Connect the BDM 250 Wiring Harnesses Step 4 Ground the System Step 5 Complete the connec on map and connect the PV Modules 5 COMMISSIONING 6 OPERATING INSTRUCTIONS 7 TROUBLRSHOOTING MAINTENANCE 8 SPECIFICATION 9 WARRANTY AND PRODUCTION INFORMATION WARRANTY CARD 01 02 02 02 02 02 03 03 04 04 04 0...

Page 3: ...ommunity and powered by electricity from solar wind and micro turbines Outside China the company has opera on offices in Chicago U S and Vancouver Canada The technology founders of the company are well known experts in the fields of power electronics automa c control signal processing and communica ons Each of the founders has mul ple U S and world patents in their specialty areas They received Ph D ...

Page 4: ...STALLATION SHOULD BE DONE BY CERTIFIED ELECTRICIAN BESIDES THE CABLE CONNECTORS NOTHING INSIDE THE INVERTER SHOULD BE MODIFIED ALL INSTALLATION SHOULD FOLLOW THE LOCAL ELECTRIC CODES FURTHER PROTECTION ON THE AC WIRING FROM THE INVERTERS SHOULD BE PROVIDED AND MAY BE REQUIRED BY LOCAL AND NATIONAL WIRING REGULATIONS THIS PROTECTION IS LIKELY TO INCLUDE RESIDUAL CURRENT DEVICES EARTH FAULT MONITORS...

Page 5: ...rranty does not cover acts of God such as lightning strikes and since lightning strikes can occur anywhere it is best prac ce to install surge protec on as part of any solar installa on Installa on of surge protec on devices should follow vendor instruc ons Installa on Procedure WARNING DO NOT CONNECT BDM 250 TO THE UTILITY GRID OR ENERGIZE THE AC CIRCUIT S UNTIL YOU HAVE COMPLETED ALL OF THE INST...

Page 6: ...roximately six inches long and are terminated with single pole connectors The AC connectors are oppositely sexed so that mul ple inverters can be connected to form one con nuous AC branch circuit 1 Orient the first BDM 250 in each branch with its male connector facing the junc on box The junc on box AC interconnect cable has a female connector The BDM 250 can be mounted with either side facing up t...

Page 7: ...area Refer to local regula on for minimum size requirement for ground conductor size Step 5 Complete the connec on map and connect the PV Modules BDM 250 connec on Map is a diagramma c representa on of the physical loca on of each BDM 250 in your PV installa on The virtual array in NEP micro inverter gateway BDG 256 is created from the map you create Complete the connec on map Each BDM 250 has a r...

Page 8: ...e BDM 250 is powered on when sufficient DC voltage from the module is applied The status LED will start flashing a er sufficient DC power is applied as an indica on that the BDM 250 is live Status standby The LED light is on by 2 second and off by 2 seconds Status producing power The LED light is on by 1 second and off by 1 second Status producing power and communica ng with BDG 256 The LED light is on ...

Page 9: ...YOUR DISTRIBUTOR FOR MAINTENANCE Disconnec ng a BDM 250 from the PV Module To ensure the BDM 250 is not disconnected from the PV modules under load adhere to the following disconnec on steps in the order shown 1 Disconnect the AC by opening the branch circuit breaker 2 Disconnect the first AC connector in the branch circuit 3 Cover the module with an opaque cover 4 Using a DC current probe verify t...

Page 10: ...ent to the Array Adc 0 OUTPUT AC Rated AC Output Power W 220 Nominal Power Grid Voltage Vac 230 Current maximum con nuous Aac 1 0 Current inrush Peak and Dura on 12A 15us Nominal Frequency Hz 50 Power Factor cos phi fixed 0 99 Maximum Output Fault Current Aac 2 2A peak Maximum Output Overcurrent Protec on Aac 6 3 Maximum Number of Units Per Branch 15 SYSTEM EFFICIENCY Peak Efficiency 96 30 CEC Efficien...

Page 11: ...xport Processing Zone Tsingtao China 266113 Phone 86 532 87963900 Fax 86 532 81100917 What does this warranty not cover Claims are limited to repair and replacement or if in NEP s discre on that is not possible reimbursement up to the purchase price paid for the product NEP will be liable to you only for direct damages suffered by you and only up to a maximum amount equal to the purchase price of t...

Page 12: ...ODUCT AND IS WHERE PERMITTED BY LAW IN LIEU OF ALL OTHER WARRANTIES CONDITIONS GUARANTEES REPRESENTATIONS OBLIGATIONS AND LIABILITIES EXPRESS OR IMPLIED STATUTORY OR OTHERWISE IN CONNECTION WITH THE PRODUCT HOWEVER ARISING WHETHER BY CONTRACT TORT NEGLIGENCE PRINCIPLES OF MANUFACTURER S LIABILITY OPERATION OF LAW CONDUCT STATEMENT OR OTHERWISE INCLUDING WITHOUT RESTRICTION ANY IMPLIED WARRANTY OR ...

Page 13: ...d 1781 Riverview Ave Tracy CA 95377 Australia Address 9 Meander Grove Cameron Park NSW2285 China Add No 1 Anhe Rd Tsingtao Export Processing Zone Tsingtao China 266113 TEL 86 532 87963900 FAX 86 532 81100917 ...

Reviews: