background image

WARRANTY INFORMATION

Acorn warrants that all of its products are guaranteed against defective material or poor workmanship for a period of 
one year from date of shipment. Acorn's liability under this warranty shall be discharged by replacing without charge 
F.O.B. City of Industry, California, any goods, or part thereof, which appears to the company upon inspection to be of 
defective  material  or  not  of  first  class  workmanship,  provided  that  claim  is  made  in  writing  to  the  company  within 
reasonable period after receipt of the product. Where claims for defects are made, the defective part or parts shall be 
delivered to the company, prepaid, at City of Industry, California for inspection. Acorn will not be liable for the cost of 
repairs, alterations or replacement, or for any expense connected therewith made by the owner or his agents, except 
upon  written  authority  from  the  Acorn  City  of  Industry  office.  Acorn  will  not  be  liable  for  any  damages  caused  by 
defective  materials  or  poor  workmanship,  except  for  replacements,  as  above  provided.  Contact  local  Acorn 
Representative for complete terms and conditions.

M A I L  A D D R E S S 

P. O .  B O X  3 5 2 7  

C I T Y  O F  I N D U S T R Y,  C A  9 1 7 4 4  U . S . A .

P H Y S I C A L  A D D R E S S 

1 5 1 2 5  P R O C T O R  AV E N U E  

C I T Y  O F  I N D U S T R Y,  C A  9 1 7 4 6  U . S . A .

T O L L  F R E E

  8 0 0 - 4 8 8 - 8 9 9 9  • 

L O C A

L  6 2 6 - 3 3 6 - 4 5 6 1

FA X

  6 2 6 - 9 6 1 - 2 2 0 0  • 

W E B

  w w w. a c o r n e n g . c o m 

Page 18 of 18

 NEO-METRO FIELD SERVICE

TOLL FREE

 800-743-8259 • 

LOCAL

  626-855-4866 • 

FAX

 626-855-4863

INSTALLATION, OPERATIONS 

& MAINTENANCE MANUAL

Please visit 

 

for most current specifications.

www.neo-metro.com

Date: 06/10/19

Part #: 6216-019-000

Summary of Contents for WEDGE 9161

Page 1: ...most current specifications INSTALLATION OPERATIONS MAINTENANCE MANUAL NEO METRO A Member of Morris Group International Morris Group 15125 Proctor Avenue City of Industry CA 91746 USA 800 591 9050 626 855 4854 Fax 606 937 4725 NEO METRO FIELD SERVICE TOLL FREE 800 743 8259 LOCAL 626 855 4866 FAX 626 855 4863 Prior to Installation 2 Dimensional Data 4 6 Warranty Information 18 Accessibility Compari...

Page 2: ...uctions for more information Important Some options may slightly alter installation To ensure proper installation review the manual thoroughly and verify rough ins before beginning any work File this manual with the owner or maintenance personnel upon completion of installation Single Temp Valve Assembly Recommended working water pressure is 30 PSI 2 07 bars minimum to 100 PSI 6 89 bars maximum Ma...

Page 3: ...26 855 4863 ACCESSIBILITY COMPARISONS 33 838 RIM MAX OBC PROFILE 34 864 RIM MAX 27 686 221 2 572 191 4 489 115 8 295 11 4 32 34 864 RIM MAX 221 2 572 191 4 489 115 8 295 BCBC 31 787 RIM MAX 24 610 221 2 572 191 4 489 115 8 295 221 2 572 191 4 489 115 8 295 11 4 32 11 4 32 11 4 32 ADA ADULT BCBC British Columbia Building Code OBC Ontario Building Code ADA ages 6 thru 12 29 737 29 737 Date 06 10 19 ...

Page 4: ...ELD SERVICE TOLL FREE 800 743 8259 LOCAL 626 855 4866 FAX 626 855 4863 INSTALLATION OPERATIONS MAINTENANCE MANUAL Please visit for most current specifications www neo metro com 191 4 489 30 762 15 381 7 178 221 2 572 Date 06 10 19 Part 6216 019 000 ...

Page 5: ...743 8259 LOCAL 626 855 4866 FAX 626 855 4863 DIMENSIONAL DATA 9162 INSTALLATION OPERATIONS MAINTENANCE MANUAL Please visit for most current specifications www neo metro com 221 2 572 7 178 15 381 15 381 72 1829 191 4 489 Date 06 10 19 Part 6216 019 000 ...

Page 6: ...43 8259 LOCAL 626 855 4866 FAX 626 855 4863 DIMENSIONAL DATA 9163 INSTALLATION OPERATIONS MAINTENANCE MANUAL Please visit for most current specifications www neo metro com 96 2438 191 4 489 30 762 30 762 18 457 7 221 2 572 Date 06 10 19 Part 6216 019 000 ...

Page 7: ...a Supply Stub Outs With Stops For Valve 1 2 NPT 120VAC 60Hz 3A Max GFCI Protected Electrical Receptacle When SO And SOS Options Are Selected Wall Anchoring Ø9 16 x 1 Long Angle Bracket Wall Anchoring Ø9 16 Mounting Point 2 Places F F F G G 67 8 175 A B C D E F G 34 864 ADA 34 864 BCBC 33 838 OBC 31 787 ADA CHILD 6 13 4 102 B D D A 7 178 14 356 8 203 5 127 8 203 E Optional SOS Sensor Operated Soap ...

Page 8: ...RE WALL ANCHORING Ø9 16 MOUNTING POINT 4 A B C D F G H WHEN DYSON AIR BLADE FAUCET SELECTED 1 2 NPT HOT COLD SUPPLY INLET MOUNTING SLOTS 8 PLACES OPTIONS ARE SELECTED PLACES MOUNTING BRACKET WITH Ø3 8 MOUNTING SLOTS E 34 864 ADA 34 864 BCBC 33 838 OBC 31 787 ADA CHILD 6 13 34 864 327 8 835 34 864 327 8 835 67 8 175 5 127 5 127 41 2 114 C 72 1828 34 864 ADA 34 864 BCBC 33 838 OBC 31 787 ADA CHILD 6...

Page 9: ...G POINT 6 A B C D F G H WHEN DYSON AIR BLADE FAUCET SELECTED 1 2 NPT HOT COLD SUPPLY INLET MOUNTING SLOTS 12 PLACES OPTIONS ARE SELECTED PLACES MOUNTING BRACKET WITH Ø3 8 MOUNTING SLOTS E 34 864 ADA 34 864 BCBC 33 838 OBC 31 787 ADA CHILD 6 13 34 864 ADA 34 864 BCBC 33 838 OBC 31 787 ADA CHILD 6 13 41 2 114 67 8 175 5 127 5 127 145 8 371 291 8 740 21 4 57 291 8 740 21 4 57 291 8 740 A A A B B B C ...

Page 10: ...e Deck Mounting Channel Rests on Mounting Bracket Finished Wall 1 Mounting Bracket 2 Installer Provided 1 4 Wall Anchors 3 Basin Assembly 2 Deck Mounting Channel 3 Finished Wall 1 Secure Fixture to finished wall using installer provided 1 2 Wall Anchors and Anchoring Hardware Locate and mount the Mounting Bracket to a finished wall Anchoring Hardware is provided by installer 1 Deck Height 41 2 114...

Page 11: ...ape on all threaded connections and make up Waste connections to 1 1 2 P Trap Deck 1 Grid Strainer w 1 1 2 16 UNE Threads 2 Rubber Gasket 3 1 1 2 P Trap 2 1 1 2 Tailpiece 3 Deck 1 With Waste connections secured mount Drain cover in the center of the Deck Install Grid Strainer and Close Elbow to Deck using Plumber s Putty 4 5 6 Finished Wall 1 Deck 2 Drain Cover 3 Flat Fiber Washer 4 1 1 2 16 UNI R...

Page 12: ...perature adjust as necessary 1 Loosen locknut 3 Turn temperature stem counter clockwise for hotter or clockwise for colder outlet temperature 2 Turn on fixture and run water for at least 2 minutes Allow supply temperature to stabilize 5 Re check outlet temperature 4 Tighten locknut to prevent accidental or unauthorized temperature adjustment Temperature Adjustment Valve Assembly Installation VALVE...

Page 13: ...oap reservoir with provided hose clamps C Install soap dispenser s onto deck NOTE Gasket and Washer are located beneath the deck D Attach 3 8 O D Tubing to the dispenser s and reservoir NOTE Check Valve must be field spliced into tubing and installed with respect to direction of flow E HINT For best results install soap reservoir fill hole directly below soap filler on deck with refill tube as sho...

Page 14: ... FINISHED LAYOUTS 9161 SHOWN FOR REFERENCE NEO METRO FIELD SERVICE TOLL FREE 800 743 8259 LOCAL 626 855 4866 FAX 626 855 4863 INSTALLATION OPERATIONS MAINTENANCE MANUAL Please visit for most current specifications www neo metro com Date 06 10 19 Part 6216 019 000 ...

Page 15: ...ion or pressurized air Debris or scale in diaphragm Remove diaphragm and clean Sensor flashes once when user s hands are within range Remove strainer and clean CONDITION FALSE TRIGGERING WATER FLOWS CONTINUOUSLY Indicators Probable Cause Solution Remove diaphragm and clean Sensor flashes when user s hands are within range Diaphragm is defective or torn Sensor is dirty or covered Clean or uncover s...

Page 16: ...aighten valve riser tubing Debris or scale in checkstop strainer Remove checkstop strainer and clean Blockage in valve flow control Remove blockage Low water pressure at supplies Increase water pressure to 30 PSI minimum Lime deposits in hot water pipes CONDITION REDUCED WATER FLOW Probable Cause Solution Air leaks from 1 8 O D tubing or fittings Replace damaged tubing or fitting Pushbutton air di...

Page 17: ...he stainless steel cleaner polish to the synthetic abrasive pads and CAREFULLY rub out spot with cleaner polish Be sure to rub in the direction of the grain Do not allow steel wool to come in contact with the stainless steel Steel particles can embed into the stainless steel surface and create rust REPAIRING SURFACE DAMAGE Surface damage such as minor chips scratches burn marks and graffiti can be...

Page 18: ...inspection Acorn will not be liable for the cost of repairs alterations or replacement or for any expense connected therewith made by the owner or his agents except upon written authority from the Acorn City of Industry office Acorn will not be liable for any damages caused by defective materials or poor workmanship except for replacements as above provided Contact local Acorn Representative for c...

Reviews: