Nemalux AR Series Installation Manual Download Page 8

8-16

www.nemalux.com  |   [email protected]  |   Tel 403•242•7475  |   Fax 403•243•6190 

MADE IN CANADA

TM

Nemalux

I N D U S T R I A L

AR Series

rev. A-30

AR-HK – HOOK PENDANT INSTALLATION (Ordered Separately)

Refer to alternate instructions if using Pendant, Wall, Pole, Yoke Mount, or High Vibration Yoke

Step 3

STEP 1.

Inspect shipping package and contents to ensure no damage has 

occurred during shipping.  Discard surface/ceiling mounting bracket 

provided with AR luminaire.

STEP 2.

It is recommended to install Secondary Safety Cable by looping 

appropriate steel cable or chain through the outer band of the unit and 

fastening a closed loop. Secondary safety hardware must be rated for a 

minimum of 180lbs. Secondary safety cables made from stainless steel 

aircraft cable are available upon request.

STEP 3.

Slide anti-rotation lock onto suspension hook assembly and install hook 

assembly into ¾ NPT threaded entry. Tighten to hand tight plus 1 to 2 

turns. Slide anti-rotation lock into place and tighten set screw to lock unit 

in place.

NOTE:

To aid in assembly and protection against ingress use of a petrolatum or 

soap thickened mineral oil based thread lubricant/sealant is necessary.

Un-used conduit opening must be plugged to maintain the integrity of 

the enclosure.

STEP 4.

Latch hook onto eye-bolt or other fixed mounting loop. Mounting point 

must be rated for a minimum of 180lbs.

STEP 5.

Install remaining loop of secondary safety chain or steel cable to suitable 

mounting location and fasten securely.

STEP 6.

Resume installation instructions provided with luminaire. (STEP 4 in AR 

Installation Instructions provided with Luminaire)

Step 2

This AR-HK kit is intended for use with UL Listed AR luminaire as 

marked on the luminaire nameplate.  

Accessory Package Contents

INSTALLATION STEPS

AR-HK

PART NAME

QTY

1

1

PENDANT HOOK ASSEMBLY

ANTI-ROTATION ASSEMBLY

This kit contains NSF component Anti-Rotation-Lock 

(1004-01-02-201)

Summary of Contents for AR Series

Page 1: ...proved Locations Class I Division 2 Groups ABCD T4 Class II Division 2 Groups FG T4A Class III Class I Zone 2 Group IIC Zone 22 Certifications NSF models ARXX XXX XX XX FS XX NSF ANSI 2 Splash and Non...

Page 2: ...0 50 60 50 60 50 60 50 60 50 60 50 60 50 60 50 60 50 60 50 60 LUMINANCE AR10 AR15 AR20 AR25 AR30 AMBIENT TEMP C INPUT VOLTAGE AC HV AC HV Optical AC Flood HV Flood 40 to 55 40 to 50 40 to 45 40 to 40...

Page 3: ...hors to the 12 7mm 0 5 holes Suspension hardware Not provided must be rated for a minimum of 180 lbs STEP 4 Open AR Lens with a 7mm socket or wrench and allow Lens to hang via retention strap Note Scr...

Page 4: ...ontrol needs 0 10V Controller must sink current from LED driver 0 10V control connections Dimming controls must be certified and suitable for the classification of the area of their installation NOTE...

Page 5: ...a petrolatum or soap thickened mineral oil based thread lubricant sealant is necessary Un used conduit opening must be plugged to maintain the integrity of the enclosure STEP 5 Insert and tension M6...

Page 6: ...M6 bolts and washers and adhesive backed gasket Apply gasket to mount with adhesive backed side Torque to 5 Nm 45 in lbs STEP 5 Install Back Cover Plate with 4x M4 Flat head screws and adhesive backe...

Page 7: ...sed thread lubricant sealant is necessary Un used conduit opening must be plugged to maintain the integrity of the enclosure STEP 3 Loosely assemble Yoke mount with carriage bolts on inside and washer...

Page 8: ...all hook assembly into NPT threaded entry Tighten to hand tight plus 1 to 2 turns Slide anti rotation lock into place and tighten set screw to lock unit in place NOTE To aid in assembly and protection...

Page 9: ...stem must be rated for 180 lbs NOTE To aid in assembly and protection against ingress use of a petrolatum or soap thickened mineral oil based thread lubricant sealant is necessary Un used conduit open...

Page 10: ...embly and protection against ingress use of a petrolatum or soap thickened mineral oil based thread lubricant sealant is necessary Un used conduit opening must be plugged to maintain the integrity of...

Page 11: ...stall and prevent loss of fasteners STEP 3 Install provided double sided tape along side of surge protector Remove backing paper and place between mounting points as shown with tape side down Install...

Page 12: ...ector to splice or terminal connected to Black leads from LED Drivers 3 Connect White lead from surge protector to splice or terminal connected to Neutral Input branch circuit conductor and White lead...

Page 13: ...nd ensure surge protector is held tightly in place STEP 4 Wire according to wiring instructions on Page 2 Refer to NEC CEC codes and follow all applicable local standards STEP 5 Close AR lens Ensure t...

Page 14: ...LED Drivers 3 Disconnect Neutral Input branch circuit conductor from splice or terminal connected to White leads from LED Driver Re connect Neutral Input branch circuit conductorto Yellow wire from su...

Page 15: ...G ATTENTION INSTALLATION STEPS AR SFY SLIP FITTER YOKE MOUNT Ordered Separately This AR SFY kit is intended for use with UL Listed AR luminaire as marked on the luminaire nameplate Accessory Package C...

Page 16: ...hain to fixed eye bolt not supplied using the second stainless steel oval shaped threaded connecting link Alternate attachment method Wrap loose end of chain around fixed beam or other immovable suppo...

Reviews: