background image

Nectre Big Bakers Oven | Operating Manual

 

1 | 

P a g e

 

 

 

 

 

 

 

N550 Bakers Oven  

 

 

CERTIFIED for USA & CANADA | SAFETY TESTED to UL 1482-2011 & ULC-S627-2000 

 

 

 

 

Pecan Engineering Pty Limited 

13 Acorn Road, Dry Creek, South Australia, 5094 

Ph: +61 8 8349 8332 | Fax: +61 8 8260 6643 | Email [email protected] 

 

 

 

 

ENGLISH INSTALLATION INSTRUCTION MANUAL

 

CA

O  

se re  

 e re m

  efore 

  r  se 

r  ew 

ve. 

re 

f

 

  m   re

    r er

m ge  

  j r   r eve   e

 

m r er 

 co

 v

 

r w rr

 

T   OT CE  

  ove   

  r er  

e    

se 

f re  m   re

 

r  fe   f

w  e 

 

r c

s.  Never  se  make- 

f  com r

e   r g  e 

 of 

  ove.  C

 

 

g  or  f re 

off ci

 

  erm   re r ct

 

 re

reme

   

r  re . 

English & French versions available: www.nectre.com | Français & Anglais versions disponibles: www.nectre.com 

READ AND KEEP THIS MANUAL FOR REFERENCE

 

Summary of Contents for N550

Page 1: ...260 6643 Email info pecan eng com au ENGLISH INSTALLATION INSTRUCTION MANUAL CA O se re e re m efore r se r ew ve re f m re r er m ge j r r eve e m r er co v r w rr T OT CE f ove r er e se f re m re r r fe f w e r c s Never se make f com r e r g e of ove C g or f re off ci erm re r ct re reme r re English French versions available www nectre com Français Anglais versions disponibles www nectre com...

Page 2: ... ANY AIR DISTRIBUTION DUCT OR SYSTEM DO NOT ELEVATE THE FIRE BY USE OF A LOG CRADLE OR GRATES BUILD FIRE DIRECTLY ON A 1 INCH LAYER OF ASH SPREAD EVENLY OVER THE BASE OF THE FIREBOX DO NOT STORE FUEL UNDERNEATH THE APPLIANCE WITHIN THE SPECIFIED INSTALLATION CLEARANCE AREAS OR WITHIN THE SPACE REQUIRED FOR CHARGING AND ASH REMOVAL ALWAYS CLOSE THE DOOR AFTER THE IGNITION LEAVING DOOR OPEN CAN CAUS...

Page 3: ...N550 Bakers Oven Installation Manual 3 P a g e Certification Label ...

Page 4: ...aded end of the handle with the extended nut attached to the by pass damper Screw the handle all the way into the nut until tight The position of the handle should be at approximately 11 o clock when the damper is open and 1 o clock when the damper is shut DO NOT ALTER THE DAMPER ADJUSTMENT RANGE TO INCREASE FIRING FOR ANY REASON INSTALLING FIRE BRICKS The stove comes with 4 fire bricks 9 x 4 x 1 ...

Page 5: ... the two support lugs with the 4 100mm strip located between them Raise the lower rear edge of the baffle plate to rest on top of the brick retainer With the baffle plate in its correct position ensure it is pushed all the way back so that it doesn tfall INSTALLING TOP AIR CONTROL ROD A stainless steel rod with a thread at one end and black knob on the other will have been supplied in the stove Pa...

Page 6: ...l board with a k factor of 0 29 the total R value of the system Rtotal is 4 brick C 1 25 1 2 mineral board K 0 29 Rbrick 1 1 25 Rmineral 1 0 29 x 0 5 0 8 1 724 Rtotal Rbrick Rmineral Rtotal 0 8 1 724 2 524 In this example the R value is greater than 2 12 required and therefore this floor protector isa suitable combination that provides the required thermal protection In the USA the floor protector...

Page 7: ...owing clearances may only be reduced by means approved by the regulatory authority A combustible surface is anything that can burn i e sheet rock wall paper wood fabrics etc These surfaces are not limited to those that are visible and include materials that are behind non combustible materials If you are not sure of the combustible nature of a material consult your local fire officials Figure 4 a ...

Page 8: ... another with three equidistant metal screws as per figure 5 b Figure 5 a Chimney connection b Stove pipeattachment This prevents any amount of condensed or liquid creosote from running down the outside of the pipe or the stovetop All joints including the flue collar connection must be secured with three sheet metal screws to ensure that the sections do not separate For the best performance the ch...

Page 9: ...aintained as per the installer s complyingmethod Factory Built Chimney When a metal prefabricated chimney is used the manufacturer s installation instructions must be followed You must also purchase from the same manufacturer and install the ceiling support package or wall pass through and T section package firestops where needed insulation shield roof flashing chimney cap etc Maintain proper clea...

Page 10: ...a masonry chimney special methods are needed Refer to figure 7 The chimney must have either a clay liner or a suitably listed stainless steel liner If the masonry chimney has a square or rectangular liner that is larger in cross sectional area than a round 6 150mm flue it should be relined with a suitably listed 6 150mm stainless steel liner Do not downsize the flue to less than 6 unless the venti...

Page 11: ...er nearby obstructions The chimney must be at least 3 900mm higher than the highest point where it passes through the roof and at least 2 600mm higher than the highest part of the roof or structure that is within 10 300mm of the chimney measured horizontally Refer to figure 8 Figure 8 Chimney height requirements Appliance Dimensions Figure 9 Dimensions mm for installer ...

Reviews: