background image

 

 

 

 

 
 
 

The flue system used when installing the heater MUST 
comply with the current installation standard AS/NZS 2918. 

Full instructions on the installation of the flue will be supplied 
with the flue kit. These MUST be adhered to, including the 
minimum exit height from the top of the floor protector 
being not less than 4.6m, and the minimum exit height above 
the roof line of roof ridge as detailed in the instructions. 

The flue must be fitted with either of the following: 

1)

 

Rear Flue Shield

 

 900mm long, minimum 160° arc, 

stainless steel rear flue shield painted black, OR 

2)

 

Solid Flue Shield

 

 a full length, solid outer flue shield 

(7.75” –

 

8” diameter) extending from the heater 

through into the drop box penetrating the ceiling. The 
base of the solid outer shield must be fitted with the 
Decromesh Locating Ring supplied with in the heater. A 
900mm high external rear heat shield (130mm wide, 
needs to be ordered separately) shall be fitted to the 
rear of the solid outer shield, positioned 25mm above 
the top of the heater and 15mm off the rear of the solid 
outer shield, OR 

3)

 

Decro-mesh

 

 a full length, half radius perforated 

decro-mesh flue shield 

(7.75” –

 

8” diameter) 

extending 

from the heater through into the drop box penetrating 
the ceiling. A 900mm half round inner reflector must be 
fitted inside the decro-mesh. Using tin-snips, cut 10mm 
tabs into the top and bottom of the inner reflector and 
bend out to create an air gap between it and the outer 
decro-mesh. The base of the decro-mesh outer shield 
must be fitted with the Decromesh Locating Ring 
supplied within the heater. 

Depending on the supplier, decro-mesh can be one of three 
sizes 

 200 mm, 7 ¾ inch, or 8 inch diameter. The 

Decromesh Locating Ring will fit the two smaller diameters 
but not the 8 inch. In this scenario, snip through the outer 
ring with tin-snips, as shown in the diagram below. Bend 

the two “arms” in a little so they ends don’t project out 

when fitted to the decro-mesh. Ensure that the snipped 
section is at the rear of the flue, out of sight. 

 

 

 

 

 

 

If the draft is insufficient or periodic down drafting occurs and 
the heater smokes or only burns slowly, extending the flue or 
fitting a specialized cowl will usually resolve the issue. 

 

Rear Flue Shield / Solid Flue Shield Installation 

 

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 

Decro-mesh Installation 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 

 

4. INSTALLING THE FLUE

 

Gently bend these in 
a little after snipping 
in the centre 

900mm stainless steel rear  

flue shield (painted black) 

OR 

Full length solid flue shield with 

external flue shield (painted black)  

Decro-mesh with solid back 

 

900mm stainless steel inner reflector 

fitted inside the rear of the decro-mesh 

 

Reviews: