The flue system used when installing the heater MUST 
comply with the current installation standard AS/NZS 2918. 

Full instructions on the installation of the flue will be supplied 
with the flue kit. These MUST be followed closely, including 
the minimum exit height from the top of the floor protector 
being not less than 4.6m, and the minimum exit height above 
the roof line of roof ridge as detailed in the instructions. 

The flue must be fitted with either of the following: 

1)

 

Rear flue shield – 900 mm long, minimum 160

° arc, 

stainless steel unpainted 

rear flue shield, OR 

2)

 

Decro-mesh – a full length, half radius perforated 
decro-mesh flue shield extending from the heater 
through into the drop box penetrating the ceiling. A 
900 mm half round inner reflector must be fitted 
inside the decro-mesh. Using tin-snips, cut 10mm 
tabs into the top and bottom of the inner reflector 
and bend out to create an air gap between it and the 
outer decro-mesh. 

If the draft is insufficient or periodic down drafting occurs 
and the heater smokes or only burns slowly, extending the 
flue or fitting a specialist cowl will usually resolve the issue. 

 

 

 

Flue Spigot Heat Reflector 

A flue spigot heat reflector is supplied inside the heater. This 
must be fitted to the flue spigot on the heater. The three lugs 
on the reflector hang inside the flue ring (spigot) with the 
reflector orientated at the rear of the heater.  

This device reflects the heat radiating from the flue spigot on 
to the rear wall. 

 

 

 

 

 

 

The Nectre MK2 LE comes with 9 full size bricks (234(h) x 
118(w) x 40(d)mm) and 2 half size bricks (234(h) x 59(w) x 
40(d)mm). 

Raise the brick retainer (supplied inside the firebox) and start 
standing the bricks up against the rear and sides of the 
firebox as shown in the diagram below.  

Once bricks are in, fit the retainer over the top to hold them 
in place. 

 

 

 