Chapter 6 Cabling
Internal Cabling
NEAX 2000 IPS Configuration Guide
NDA-24347, Issue 1
Page 59
AC Cord
The AC cord provides a connection between the AC/DC power card and base unit.
Figure 6-4 AC Cord Connection
Table 6-5 AC Cord
SYMBOL
NAME CODE
PART
NUMBER
REMARKS
A
AC CORD-B-U
151010
AC Power Cable (Included in PIM)
B
AC CORD-D-U
151033
AC Power Cable for Base (Included in Base)
P
W
R
P
W
R
P
W
R
P
W
R
P
W
R
P
W
R
P
W
R
P
W
R
PIM 3
PIM 2
PIM 2
PIM 0
PIM 7
PIM 6
PIM 5
PIM 4
A
A
A
A
A
A
A
A
To Base Unit
B
To AC Commercial Power
Base Unit
Summary of Contents for UNIVERGE NEAX 2000 IPS
Page 1: ...NDA 24347 ISSUE 1 STOCK 152051 Configuration Guide MAY 2002 NEC America Inc...
Page 34: ...NEAX 2000 IPS Configuration Guide Page 24 NDA 24347 Issue 1 This page is for your notes...
Page 46: ...NEAX 2000 IPS Configuration Guide Page 36 NDA 24347 Issue 1 This page is for your notes...
Page 62: ...NEAX 2000 IPS Configuration Guide Page 52 NDA 24347 Issue 1 This page is for your notes...
Page 88: ...NEAX 2000 IPS Configuration Guide Page 78 NDA 24347 Issue 1 This page is for your notes...