![background image](http://html1.mh-extra.com/html/nec/sl1000/sl1000_technical-training-manual_3883801008.webp)
NEC Confidential
© NEC Corporation 2009
Page 8
Power Failure Transfer
• SLT is connected to the Extension Port No. 8/16/24/32.
• Change the switch position of “J6” from “
KT”
to “
PF”
. (Default : KT)
Connected extension must be SLT.
Trunk Port
Ext. Port
No. 1
No. 8
No. 4
No. 16
No. 7
No. 24
All terminals on Slot No.4 must be Analog
Terminals.
บริษัท โปรเฟสชั�นแนล พีเอบีเอ็กซ์ จํากัด โทร. 02-519-1718 Hotline. 084-920-5065
Summary of Contents for SL1000
Page 1: ...Technical Training System Installation Next Topaz...
Page 2: ...Part 1 Hardware Installation...
Page 14: ...Part 2 System Start Up Programming...
Page 39: ......