Inst
alling Serv
er
3-15
S
tep
s to Inst
all the Rack-mount Model to th
e T
o
w
e
r Conversion Kit
Follow the procedure
below t
o
install the de
vices to the t
o
wer conversi
on kit.
1.
Op
en
t
h
e
fro
n
t
d
oor
o
f t
h
e tower co
nv
ersion
k
it.
If the
door is
l
o
cke
d,
use
the
serve
r-acce
ss
ory
key
to
un
lo
ck
.
2.
Confirm
the spots to fix 8 core nuts
on the
front
of the c
h
assis.
See the
figure
on the
right for where to
fix
the core
nuts
(4
o
n
t
h
e f
ront
top a
n
d
4
on
th
e fr
o
n
t b
o
ttom
.)
8 c
o
re
nuts ha
ve
been i
n
stalled
on t
h
e
fr
ont
of
the
chassis.
3.
Inse
rt t
h
e
brac
ket
fr
om
the
fr
ont
of
the
c
o
nversi
on
kit.
T
u
ck t
h
e
bracket firm
ly to the back.
T
o
we
r c
o
n
v
er
si
on
ki
t (
o
n t
h
e
fr
ont
b
o
tt
o
m
)
T
o
we
r c
o
n
v
er
si
on
ki
t (
o
n t
h
e
fr
ont
t
o
p
)
Summary of Contents for N8800-128F
Page 6: ...NEC Express5800 WARNING CAUTION CAUTION...
Page 7: ......
Page 8: ...CLASS 1 LASER PRODUCT...
Page 11: ......
Page 14: ...iv Windows 1 4 ON OS 5 6 6 2 6 15 x 3...
Page 18: ...1 2 Before Using...
Page 20: ...1 4 Before Using...
Page 28: ...1 12 Before Using WARNING POWER CAUTION...
Page 29: ...Before Using 1 13 WARNING CAUTION AC...
Page 30: ...1 14 Before Using HDUWK SLQ...
Page 31: ...Before Using 1 15 CAUTION...
Page 32: ...1 16 Before Using CAUTION NEC...
Page 33: ...Before Using 1 17 WARNING CAUTION...
Page 34: ...1 18 Before Using CAUTION CAUTION...
Page 35: ...Before Using 1 19 CAUTION EIA 8...
Page 37: ...Before Using 1 21...
Page 38: ...1 22 Before Using This page is intentionally left blank...
Page 80: ...4 20 ESX Server Setup 1 10 Enter LUN Hex select 00 1 11 Select Boot LUN select 01...
Page 108: ...5 16 Procedures after Completion of Installation This page is intentionally left blank...
Page 112: ...6 4 Troubleshooting This page is intentionally left blank...
Page 114: ......
Page 115: ......