42
Draw and Mark the Anchor Positions on Wall
6.1.2
Start from the middle and mark the positions for the anchor points to drill out. (See markings
in figures below or the dimensions in Table 7.)
Use the spirit level to check the vertical alignment of the marks before drilling.
Figure 39: Positions for Anchor Points: 4×4 Frameset
Figure 40: Positions for Anchor Points: 5×5 Frameset
Figure 41: Positions for Anchor Points: 6×6 Frameset
Summary of Contents for LED-FA025i2-220
Page 61: ...61 Figure 78 Screen Settings for 8 8 Controller...
Page 91: ...91 Part Name AC terminal Hub For 0 9 mm only CAT cable Mask For 1 5 1 9 2 5 3 8 mm only...
Page 96: ...96 LED FA015i2 137 Data Connections 15 1 3 LED FA015i2 137 Power Connections 15 1 4...
Page 97: ...97 LED FA019i2 165 Data Connections 15 1 5 LED FA019i2 165 Power Connections 15 1 6...
Page 99: ...99 LED FA012i2 220 Data Connections 15 1 9 LED FA012i2 220 Power Connections 15 1 10...