2. Installation and Connection
Express5800/R310g-E4, R320g-E4, R320g-M4 User's Guide
55
Chapter 2 Preparations
2. Confirm the location of four cage nuts on the front of the kit.
See the figure below for locations of the core nuts (two on the front top and two on the front bottom.)
Note
Four cage nuts have been installed on the chassis of the kit at shipment.
3. Remove one screw from the AC lock bracket on the rear of the tower conversion kit.
4. Remove the AC lock bracket.
Tower conversion kit (on the front top)
Tower conversion kit (on the front bottom)
AC lock bracket
Summary of Contents for Express5800/R310g-E4
Page 83: ...MEMO...