background image

Express5800/120Ed Rack Mount installation Procedures   13

Removing a Foot Stand

Each of the four foot stands located on the bottom of the server unit consists of a
three piece assembly and are easily removed (see Figure 10).

Note:

 

Each foot stand is secured with two small screws.

1. 

Power off the system and remove the left side panel of the server unit as
described earlier in this chapter.

2. 

Position the server unit on its right side.

3. 

Remove the two screws securing the foot stand to the bottom of the server
unit. The two screws are located inside on the bottom of the server unit.

Note:

 

If an option card is installed in the bottom

expansion slot of the server unit, it may be necessary to
remove the option card, before the hex screw can be
removed that is located under the card.

4. 

Remove the foot stand (stationary base, movable stand, and long stem nut)
from the server unit.

5. 

Repeat steps 3 and 4 until all four foot stands are removed.

Summary of Contents for Express5800 120Ed

Page 1: ...Express5800 120Ed Rack Mount Kit Installation Procedures PN 455 01607 001...

Page 2: ...ce of each such product is dependent upon factors such as system configuration customer data and operator control Since implementation by customers of each product may vary the suitability of specific...

Page 3: ...nit 7 Removing the Front Bezel 7 Removing the Side Panels 8 Installing the LED Holder and Labels 9 Removing a Foot Stand 13 Installing the New Front Bezel 15 Installing the Side Panels 18 Preparing th...

Page 4: ......

Page 5: ...lation Procedures 3 Introduction This guide provides you with assembly information for preparing and mounting your Express5800 120Ed Server small tower unit into a system rack see Figure 1 Figure 1 Ra...

Page 6: ...entative 3 Save the container and packing materials for any future reshipment Table 1 Rack Mount Kit Parts List NZA 1203 00 00 Item Name Description Part Number A Rail Kit 1U Rail Kit includes Left Mo...

Page 7: ...Express5800 120Ed Rack Mount installation Procedures 5 B C D E G Express5800 120Ed A F H Figure 2 Rack Mount Kit Parts...

Page 8: ...rify that the reassembly was performed correctly If the problem persists see the Problem Solving chapter in your System User s Guide What You Need In addition to the carton contents the only tools you...

Page 9: ...tems are removed then the new front bezel for rack mounting can be installed on the front of the server unit Removing the Front Bezel CAUTION If you are removing the front bezel after the server unit...

Page 10: ...d To remove a side panel 1 Power off the server unit and ensure it is disconnected from the ac wall outlet 2 The side panel is secured to the chassis with three screws Remove the screws see Figure 4 s...

Page 11: ...t hand side of the server chassis A name plate logo and two other labels are then adhered to the new front bezel of the server unit To install the LED Holder and labels perform the following 1 Power o...

Page 12: ...e LED holder see Figure 6 Power HDD Figure 6 Removing LEDs from the LED Holder 6 Feed the Power and HDD LED cable assemblies back through the mounting hole in the front of the chassis 7 Reroute the po...

Page 13: ...new LED holder see Figure 7 Figure 7 Inserting the Relocated LEDs into the New LED Holder 9 Insert the bottom tab of the new LED holder into the mounting hole slot in the front of the chassis while p...

Page 14: ...o its mounting hole slot while pushing down on the top tab of the holder and snap the LED holder into place 11 On the front of the new bezel adhere the three new labels as shown in Figure 9A B and C A...

Page 15: ...ier in this chapter 2 Position the server unit on its right side 3 Remove the two screws securing the foot stand to the bottom of the server unit The two screws are located inside on the bottom of the...

Page 16: ...ss5800 120Ed Rack Mount installation Procedures 14 Top Bottom A B C D E Figure 10 Removing a Foot Stand Item Description A Long Stem Nut B Movable Stand C Stationary Base D Hex Screw E Phillips Head S...

Page 17: ...Position the server unit on its right side Figure 11 Install the Front Bezel Handles 3 Install two handles onto the new front bezel with the four screws supplied See Figure 11 4 Remove the Device Bay...

Page 18: ...see Figure 13 If necessary loosen the screws on the bottom screw brackets of the front bezel so that the tab hooks can be easily aligned to go into the bottom tab slots of the server unit CAUTION Be c...

Page 19: ...three screw holes underneath the bottom of the front bezel and loosen the screws see Figure 14 Firmly hold the bottom of the bezel flush against the bottom of the server chassis and tighten the screws...

Page 20: ...ng the Side Panels 1 Before replacing the side panels make sure no tools or loose parts have been left inside the server unit 2 Make sure all option boards are firmly seated in their respective slots...

Page 21: ...ferring to Figure 16 remove any screws securing the front mounting bracket A to the rear mounting bracket B Perform this step on the right rail assembly 2 Select an appropriate location in the rack ca...

Page 22: ...ied 4 Attach the left front and rear mounting brackets to each other using three of the Phillips head self tapping screws and flat washers supplied See Figure 18 Figure 18 Securing the Front and Rear...

Page 23: ...u have someone help you lift or move the system WARNING Ensure that the location of the rack mount server unit does not create an unstable condition when installed in the rack cabinet 1 Lift the rack...

Page 24: ...ount installation Procedures 22 A Rear vertical mounting rail B Front vertical mounting rail C Rack mount server unit D Four plastic washers E Four screws Figure 19 Installing the Rack Mount Server Un...

Page 25: ...devices such as a printer or modem by following the instructions included with these devices CAUTION Damage to the system may result if the keyboard mouse cable is inserted or removed when power is a...

Page 26: ...ing of the system The power cord connector that plugs into the wall outlet must be terminated in a grounding type male plug designed for use in your region It must have certification marks showing cer...

Page 27: ...nce a 1 5 second delay from the time you press the push button power on off switch on the front panel and your system powering down This is normal system operation and is required by the server manage...

Page 28: ......

Page 29: ......

Reviews: