![NEC Express5800 120Ed Installation Procedures Manual Download Page 10](http://html1.mh-extra.com/html/nec/express5800-120ed/express5800-120ed_installation-procedures-manual_4099439010.webp)
Express5800/120Ed Rack Mount installation Procedures 8
Figure 3. Removing the Front Bezel
Removing the Side Panels
!
CAUTION
If you are removing a side panel after the server unit is set
up, you must first power off the system and all external
devices.
Unplug
the system power cord
To remove a side panel:
1.
Power off the server unit and ensure it is disconnected from the ac wall
outlet.
2.
The side panel is secured to the chassis with three screws. Remove the
screws (see Figure 4) securing the side panel. Save the screws for
reattaching the side panel.
3.
Slide the side panel toward the rear of the chassis. This unlocks the locking
fingers behind the side panel.
4.
Pull the side panel up and away from the chassis.
5.
Remove both the right and left side panels.
Summary of Contents for Express5800 120Ed
Page 1: ...Express5800 120Ed Rack Mount Kit Installation Procedures PN 455 01607 001...
Page 4: ......
Page 28: ......
Page 29: ......