50
Site Preparation
Installation Guidelines
•
To prevent moisture from entering system, the front of the display
must be in close contact with the opening in the enclosure.
•
Within every custom enclosure, the Electronics Box Back Cover
MUST remain installed because it helps dissipate the heat
generated by the CPU.
•
Adequate ventilation must be provided in every custom enclosure.
The maximum allowable ambient temperature within any
enclosure is 45
o
C (113
o
F).
•
To prevent accidental shorts, the power supply and any other
peripherals within the enclosure must be mounted securely and
within reach of the display’s connectors.
•
This feature comes with a motion sensor that is at the end of a
381 mm (15 in.) cable. When using the motion sensor, it must be
mounted between 25 and 76 mm (1 to 3 in.) below the bottom of the
display and centered along the width of the display.
•
Compliance of this device with regulatory requirements must be
verified in the end-use application.
•
This device is a component that requires a suitable enclosure in its
end-use application. The end-use product in which this component
is used should be certified in accordance with UL 1950, EN60950,
IEC950 or other applicable safety standard.
Caution:
NCR displays are not designed for horizontal or inverted
use. NCR displays must be mounted no more than 40
o
forward or
backward from horizontal. Failure to follow this guideline could result
in overheating.
Summary of Contents for EasyPoint 7401
Page 1: ...NCR EasyPoint 7401 Release 2 4 Site Preparation Guide 19797 NCR B005 0000 1255 Issue C...
Page 8: ...vi Site Preparation...
Page 20: ...2 Site Preparation 7401 45xx Model 19889d...
Page 57: ...Site Preparation 39 Terminal with K521 Wall Mount 19291 7 in 8 7 in 4 in 7 8 in K521...
Page 62: ...44 Site Preparation Mounting Screw on both sides 17735 K525 with K530 Pole Mount Straps...
Page 84: ......
Page 89: ......
Page 90: ...B005 0000 1255 May 2002 Printed on recycled paper...