background image

10

Memory Upgrade

Installing the EBox cover

Caution:

Properly hold and support the EBox cover while loosening or tightening the

screws that secure the EBox cover to the EBox chassis.

1. Mount the cover on the chassis, inserting the mounting keyholes over the screws.

2. Slide the cover backward and tighten the two screws to secure the cover to the

chassis.

Note:

The EBox illustration above does NOT show the actual EBox orientation when

the fascia is in open position.

3. Double-check to ensure that no cables are accidentally loosened or disconnected. In

case of loosened or disconnected cables, refer to

Cable Connection

on the facing page.

Summary of Contents for 7702-K134

Page 1: ...Kit Instructions Memory Upgrade 7702 K134 138 Issue C ...

Page 2: ...notice must be included It is the policy of NCR Corporation NCR to improve products as new technology components software and firmware become available NCR therefore reserves the right to change specifications without prior notice All features functions and operations described herein may not be marketed by NCR in all parts of the world In some instances photographs are of equipment prototypes Sof...

Page 3: ...OS XR7 7702 Installation Procedures 2 RealPOS XR5 7603 Installation Procedures 4 SelfServ 75 7705 Kiosk Installation Procedures 5 Turn off the kiosk 5 Removing the EBox cover 7 Installing the Memory Module 8 Installing the EBox cover 10 Cable Connection 11 ...

Page 4: ...ii Revision Record Issue Date Remarks A Jun 2014 First Issue B Jul 2018 Added installation procedures for SelfServ 75 Kiosk C Jul 2019 Updated procedures for 7705 Kiosk ...

Page 5: ...n 7702 K134 4 GB Memory Module DDR3 1600 7702 K138 8 GB Memory Module DDR3 1600 Warning Disconnect the AC power cord before disassembling the Terminal Caution Static Electricity Discharge may permanently damage your system Discharge any static electricity build up in your body by touching your computer s case for a few seconds Avoid any contact with internal parts and handle cards only by their ex...

Page 6: ...ded by installing a second module in the upper socket Socket 2 1 Lay the terminal face down on a flat surface Caution Always use a soft material cloth foam to protect the display screen when placing the terminal face down 2 Remove the Base Stand and Rear Cover assembly a Loosen the captive screws 2 that secure the Rear Cover to the chassis b Pivot the assembly as shown to remove it ...

Page 7: ...il it latches in position Ensure that the edges of the module engage the latches and that the latches are completely engaged Note After powering up the terminal re flash the SPI BIOS to ensure the latest version is installed and verify that the terminal is fully functional see the BIOS Updating Procedures chapter in the NCR RealPOS XR7 User Guide B005 0000 2332 During this operation you will see a...

Page 8: ...ne of the Memory Module Sockets 3 Align the DIMM in the socket and push it straight down by applying pressure on the ends smoothly with both hands as indicated by the arrows below Note that the DIMM connector is keyed 4 Ensure that the edges of the DIMM engage the latches and that the latches are completely closed ...

Page 9: ...ling the Memory Module the kiosk must be completely powered down using the procedures indicated in this section However if necessary the External AC Power Cable can also be used to disconnect power 1 Attach a CE keyboard to the kiosk 2 Exit and close the Kiosk Software Application 3 To shut down the Kiosk Operating System select Start Shut down Note For Windows 10 select Start Power Shut down 4 Pu...

Page 10: ...ory Upgrade 5 If a Sidecar is present push the Sidecar PSU Orange switch to the 0 position 6 If a UPS is present push the power switch to shut it down 7 Disconnect the AC Power Cable from the AC power source ...

Page 11: ...ed while removing the EBox cover and installing the Memory Module it is recommended to take a picture of the cable connections to the EBox and of the cable routing This action may be helpful in case any of the cables get disconnected during the memory upgrade procedures 1 Loosen the two screws at the top of the EBox cover 2 Slide the EBox cover upwards and remove it from the EBox chassis The memor...

Page 12: ...er hold more than one module at a time Never bend or twist the modules as this could seriously damage the contacts Observe anti static precautions when handling the memory modules To install a Memory Module perform the following steps 1 Open the latches at the ends of the vacant Memory Module Socket ...

Page 13: ...e Memory Module to the notch on the socket and push the module straight down by applying pressure on the ends smoothly with both hands 3 Ensure that the edges of the module engage the socket latches and that the latches are completely closed ...

Page 14: ...nserting the mounting keyholes over the screws 2 Slide the cover backward and tighten the two screws to secure the cover to the chassis Note The EBox illustration above does NOT show the actual EBox orientation when the fascia is in open position 3 Double check to ensure that no cables are accidentally loosened or disconnected In case of loosened or disconnected cables refer to Cable Connection on...

Page 15: ...Panel Cable USB 3 0 Ports 19 inch Touchscreen USB Mini Hub from top Box USB Mini Hub LAN LAN RS 232 COM 1 Note Acceptor USB 1 PIN Pads IPP350 VX805 820 or UX300 MSR USB 2 Barcode Scanner USB 3 USB Camera Digitizer USB 4 Trackball and Switch Audio Out Line Out from MIDI MISC IF DC Power DC distribution from EBox Mini DC hub ...

Reviews: