Non-Scale 1-Bag Bagwell Upgrade
15
c. Lift Bagwell up and away from the Core Cabinet. The upper screw heads will
pass through the key holes in the Bagwell side support.
Note:
The two (2) upper screws may be left in place if a new Bagwell will be
installed in the same orientation. Otherwise, remove the screws from the side of
the Core.