
39
Document Number
DCV-00545
Date Released
Jul. 2020
Revision Number/Security level
R01 S2
Retrofit OPTIC 5 Touch+ InvencoLink Wayne Ovation (US & Canada)
Installation Guide
To avoid damaging the RFK panels in the following steps where screws are being
placed into the brass bushes, it is very important to start each screw by hand,
ensuring you use the existing thread.
DO NOT USE any type of powered tool to start the screws.
9. Take the RP00020-XX RFK Hatch Panel with the OPTIC 5 Touch pre-mounted and place it in the
largest opening in the pump door from the outside. Ensure the panel is the correct way up, with
the OPTIC 5 Touch
OPT’s display screen towards the top-left of the panel.
10. Carefully start eight MN0043 M3x15 Stand-Offs by hand into the bushes on the inside of the RFK
Hatch Panel.
Secure with
Stand-Offs
Screen towards top-left of pump
Lock on the left-hand side