Confidential and proprietary information of NCR.
Unauthorized use, reproduction and/or distribution is strictly prohibited.
4
In addition to the need to comply with the requirements specified, electrical
wiring and mechanical systems must also comply with all relevant codes, laws,
and regulations.
It is important that a customer or his agent who is fully conversant with the
special requirements of electronic equipment prepare the site. The responsibility
of ensuring that the site is prepared in compliance with this document remains
with the customer.
For information and guidance purposes only, a list is provided, in general terms,
of those matters for which the customer is responsible. This list is not intended
to be comprehensive, and in no way modifies, alters, or limits the responsibility
of the customer for all aspects of adequate site preparation.
NCR staff will be available to answer questions relating to the contents of this
document except where:
l
A customer has been notified that a full or partial consultant service is
available and/or that NCR will be willing to undertake a preliminary or final
site survey and
l
The customer shall have entered into a formal contract with NCR for
provision of the same.
No comment, suggestion, or advice offered or not offered about preparation of
the site, nor any inspection of the site, whether before of after preparation, is to
be taken as approval of the location of the site and equipment or its preparation.
NCR will not be liable in respect to any comment, suggestion, or advice given by
its staff or in respect to any failure to give advice.
Finally, only the customer can know the full extent of the damage that may be
caused to his business by reason of failure of the equipment that is to be
installed. For this reason, it is the customer's responsibility to ascertain the
extent of any such possible damage to his existing or planned business, and to
effect full insurance in respect of it.