SECTION 2

Description of Boiler.

               

1

 

Supply to radiators, hot water tank etc.

                 2 Flue pipe/chimney connection. 

                 3 Return from the radiators, hot 
water tank etc

                 4 Thermostat pocket .
                 5 Emptying and filling of water to 

the system.

           

Manufacturers plate and serial number.

  

         

                      

Dimensions of boiler.

Opop boilers: table 1

Model number: 

418

430

460

4120

Power kw

18

30

40 – 60

80 - 120

Height mm

865

865

1005

1305

Width mm

386

490

800

1000

Depth mm

533

533

720

920

Flue

mm

130

145

160

180

Water content litres

26

35

56

105

Weight kg

160

200

245

335

Connections 

1 ¼”

1 ¼”

1 ½”

2”

                                                  Page 3

                 

Burner/ boiler type.

Scotte / OPOP

Output

16/24/30 kW

Classification EN 303-5

3

Test pressure

4.0 Bar

Max. operational pressure

2.5 Bar

Water content

26 litres

Boiler weight

160 kg

Exit gas temperature, nominal load

115°C

Exit gas temperature, low load

66°C

Flue gas mass flow rate, nominal 

load

37.7 kg/h

Flue gas mass flow rate, low load

18 kg/h

Waterside resistance, delta T = 20 °K

1.37 mbar

Waterside resistance, delta T = 10 °K

5.39 mbar

Operating temperature

min. 35

û

C

Max. temperature

90

û

C

Efficiency

93.3 %

Power consumption 220 V

35 Watts

Manufacturer:

NBE

Tel.:

DK 9830 Tårs

0045-96892630

Serial Number

Summary of Contents for Scotte 16kw

Page 1: ...Scotte Opop Installation and operating Manual 16 24 30kw NORDIC BIO ENERGY LTD Pellets Systems...

Page 2: ...screw and pellet silo assembly page 5 6 Section 4 Installation Boiler connection page 7 Flue pipe connection page 7 Section 5 Operating the burner First time start up page 8 Adjusting the burner page...

Page 3: ...ing has to be carried out in accordance with Building Regulations Republic of Ireland Part F Ventilation Part J Heat Producing Appliances Article 41 in N Ireland Part J in England and Wales and F in S...

Page 4: ...tent litres 26 35 56 105 Weight kg 160 200 245 335 Connections 1 1 1 2 Page 3 Burner boiler type Scotte OPOP Output 16 24 30 kW Classification EN 303 5 3 Test pressure 4 0 Bar Max operational pressure...

Page 5: ...Dimensions of burner and wiring diagram Page 4...

Page 6: ...hose to the top of the inlet tube on the burner unit and the other end of the thermoplastic hose to the outlet of the feed screw 2 mount the feed screw over the burner so the pellets can fall into th...

Page 7: ...completely from time to time The more dust that is in the silo the less pellets the feed screw will release and the boiler will become unadjusted leading to inefficiency and possible breakdown How oft...

Page 8: ...fault Flue pipe and chimney connections Use the correct flue size for boiler model table 1 page 3 Ensure adequate height of chimney to gain satisfactory draw and to prevent back draft A suitable cowl...

Page 9: ...first time start up refer to quick start guide on page 15 The outputs for high and low loads are run by the control system in a 100 step modulation and the changes between the different steps are mad...

Page 10: ...d there will also be the risk of a breakdown 3 Feed screw in high load factory settings 33 6 press the UP or DOWN buttons to adjust the quantity of pellets that corresponds to the blower speed It is i...

Page 11: ...rol Standard 0 OFF C2 Calibrating sensor 0 C3 Time with low O2 before stopping pellets Standard 30 min D1 Times of starts each day Standard 0 x D2 Max running time on each start Standard 60 min D3 Fir...

Page 12: ...ning The boiler The boiler should be emptied from ash and all of the surfaces should be brushed in order to remove soot particles Pay particular attention to ash in the exhaust deflector and the flue...

Page 13: ...IS NOT MOUNTED 1 the connector is not mounted correctly 2 dirt in the connector 3 sensor defective Check the connector on the burner Clean pellet debris dust from the connector Change the sensor photo...

Page 14: ...emperature safeguard with sensors 5 Pump 6 Safeguards set 2 5 bars 7 Pressure expansion 8 Return valve with remote sensors Tap 9 Thermometer 10 Return valve 11 Taps 12 Hot water containers 13 Feed 14...

Page 15: ...ce Engineers are trained to ensure that your wood pellet burning equipment works safely and efficiently A list of Service Engineers in your area is available from Green Energy Solutions They will chec...

Page 16: ...Page 14...

Page 17: ...power the DOWN key stops feed screw 2 Run pellets in a bucket for 15 min Amount 360 sec Pellets 6 min Read the result on the back side Put in the numbers in menu 2 3 4 The feed screw is stopped on do...

Page 18: ......

Page 19: ...Quick Start 16kw NBE Pellets Systems Estimating Table...

Page 20: ...Quick Start NBE Pellets Systems Estimating Table...

Page 21: ......

Page 22: ...Quick Start NBE Pellets Systems Estimating Table...

Reviews: