1.   Turn off all equipment to be fed by the PeakFlowE

TM

 System, 

locate water supply shutoff valve and turn OFF.

2.   Determine if the water line has an existing water treatment 

system. If so, examine system for use of polyphosphate or 

other scale inhibitors. PeakFlowE

TM

 will not be effective if used 

in conjunction with other scale inhibitors. Remove the scale 

inhibitors from the water line or discontinue installation.

3.   Install a 

3

/

4

" full-flow ball valve on the water supply side  

that will feed the water system.

4.   Anchor the PeakFlowE

TM

 system on a wall stud or suitable 

mounting material spanning wall studs. System must be  

vertical and upright.

5.   Run a suitable line from the 

3

/

4

" full-flow ball valve at the 

tap water source to the inlet ball valve on the left side of 

the PeakFlowE

TM

  system. Use 2-3 wraps of Teflon

®

 tape and 

brace the inlet ball valve on the system with a wrench 

when connecting the feed water line.  NOTE:  DO NOT 

OVERTIGHTEN CONNECTION FITTING INTO BALL VALVE.

6.   Select the appropriate size tubing for the equipment being 

fed and connect it to the outlet of the PeakFlowE

TM

 System. 

NOTE:  DO NOT connect the tubing to the equipment at this 

time. Prior to making connection to the equipment, this line 

will be used to facilitate flushing the system. As an option,  

a drain valve in a tee on the outlet side of the PeakFlowE

TM

 

system could be provided in the line to facilitate flushing 

when changing filters. 

7.   With PeakFlowE

TM

 inlet valve closed, slowly open the 

3

/

4

" full-

flow ball valve at the tap water source. Check for leaks.

8.   

  If a drain valve was not installed on the outlet side of the 

system, hold the tubing that will connect to equipment in 

a clean bucket or over sink or drain. Open the system inlet 

feed valve and allow water to flush through system for 2 

minutes at the specified system flow rate to allow air bubbles 

to escape.  NOTE:  NO ACTIVATION IS REQUIRED FOR THE 

PeakFlowE

TM

 SYSTEM TO PERFORM PROPERLY.  FLUSHING 

IS RECOMMENDED TO ALLOW AIR TO ESCAPE THE 

SYSTEM.

9.   Make certain that the end of the tubing to be connected  

to the equipment is clean and sanitary.

10.    Connect tubing to equipment. Open all water supply valves 

and check for leaks.

11.   If no leaks, turn on equipment and check for normal operation.
12.   Attach the Service Log to the installed PeakFlowE

TM

 System 

and fill in install date.

Installation

Installation Drawings & Dimensions

Dimensions — Weights

Model

Dimensions

Weight

A

B

C

D

E

in.

mm

in.

mm

in.

mm

in.

mm

in.

mm

lbs.

kgs

GXXX001725

18

1

2

470

4

1

2

114

8

5

8

219

10

254

3

76

15

6.8

The overall height and the height of the inlet fitting varies due to material variations and assembly tolerances. Please allow 

additional clearance above the filter for making connections.

Wall

4

1

2

"

5" 

to inlet

Mounted to secure wall

 

on studs or wall panel – 

Do not mount to unsupported

 

sheet-rock or gypsum board. 

3

4

ball valve inlet 

connection to 

water supply

C

13

1

2

"

3" Min. Removal Clearance

22" Min to 50" A.F.F.

Installation Height

1"

on the cold water supply only 

Mounted to secure wall 

on studs or wall panel – 

Do not mount to unsupported

 

sheet-rock or gypsum board.

ball valve with 

3

4

"

FNPT inlet connection 

from building 

water supply

D

B

E

A

6

1

2

"

3" Min. Removal Clearance

5"

3

4

Water filtration unit must be installed

Full flow

Full flow