
INSTALLATION
Measuring Inlet Gas Pressure:
30
Procedure to measure the inlet gas pressure:
1. Shut off the manual gas valve on the supply gas line.
2. Open a hot faucet. The unit should turn on and the gas in the
gas pipe line should purge. Leave the faucet on to keep the unit
running until the unit shuts down due to lack of gas supply.
Then shut off the hot faucet.
3. Remove the screw for the pressure port located on the gas
inlet of the Water Heater.
4 Connect a manometer to the pressure port and reset it to
zero.
5. Re-open the manual gas valve. Check to see that there are
no gas leaks.
6. Open multiple fixtures that have high flow rates (bathtub, showers, kitchen sink) to
ramp the Water Heater up to its maximum burn.
7. When the Navien Water Heater is at maximum burn, check the inlet gas pressure
reading on the manometer; it should read between 5.0” and 10.5” WC for
Natural gas between 8.0”(9.0”) to 13.5” WC for Liquid Propane.
8. The maximum inlet gas pressure must not exceed the value specified by the
manufacturer and the minimum value listed is for the purposes of input adjustment.
Pressure test port on gas line
Summary of Contents for NR-180A
Page 5: ...SAFETY Safety Instructions 5 this...
Page 7: ......
Page 10: ......
Page 11: ......
Page 12: ......
Page 15: ......
Page 17: ......
Page 19: ......
Page 20: ...INSTALLATION Locating the Water Heater 20 or follow local codes...
Page 21: ......
Page 23: ......
Page 24: ...INSTALLATION Pressure Relief Valve 24 Pressure Relief Valve Shut off Valve...
Page 25: ......
Page 26: ......
Page 31: ......
Page 32: ...INSTALLATION Venting 32 ground or local codes...
Page 33: ...INSTALLATION 33 Venting...
Page 34: ......
Page 35: ...INSTALLATION 35 Venting Clearances 1 Natural Natural...
Page 37: ...INSTALLATION 37 Venting Indoor Installation...
Page 39: ...INSTALLATION 39 Venting CONCENTRIC VENT TERMINATION 1 Sidewall Installation 2 Roof Installtion...
Page 40: ...INSTALLATION Venting 40...
Page 42: ......
Page 43: ......
Page 44: ...INSTALLATION PCB Board Settings 44...
Page 45: ...INSTALLATION 45 CascadeConnectionandSet upProcedures...
Page 46: ...INSTALLATION 46...
Page 47: ...INSTALLATION 47...
Page 50: ......
Page 55: ...INSTALLATION 55...
Page 56: ...INSTALLATION 56...
Page 57: ......
Page 58: ......
Page 59: ......
Page 61: ......
Page 63: ......
Page 65: ......
Page 68: ...OPERATION Navien America Inc Limited Warranty 68 12 Grains of hardness may...
Page 69: ...OPERATION 69 Model Description Legend...
Page 70: ...OPERATION General Parts 70 Condensate Water...
Page 71: ...OPERATION 71 General Parts Condensate Water...
Page 72: ...OPERATION Remote Controller 72 Hot Water In Use Indicator...
Page 74: ...OPERATION OPERATION Setting the Clock 74 Hour Minute...
Page 79: ...OPERATION 79 A Series Recirculation Timer Setting 74...
Page 81: ...OPERATION 81 Lock Function Setting...
Page 82: ...OPERATION Well Pump setting function 82...
Page 85: ......
Page 89: ...OPERATION 89 A Series External Recirculation Mode...