20
Insta
ll
ing
the
Water
Heater
3. Leave the faucet on until the water heater shuts down due
to a lack of gas supply, and then turn off the hot water
faucet.
4.
R
emove the front cover by loosening the four Phillips head
screws securing it to the case.
CAUTION
Ensure that no cables are in the way before folding down
the PCB assembly. If the assembly is stuck, do not force
it. Doing so may damage the cables and result in serious
malfunctions. Check again to ensure that no cables or any
other parts are in the way before you proceed.
5. Loosen the screws indicated in the figure below and
connect a manometer to the pressure port.
R
eset the
manometer to
z
ero before use.
Digital pressure
manometer
6.
R
e-open the manual gas valve and check for leaks.
7
. Open multiple fixtures that have high flow rates, such as
bathtub and shower faucets, to ramp the water heater up to
its maximum firing rate.
8. When the water heater reaches its maximum firing rate,
check the inlet gas pressure reading on the manometer.
The gas pressure must fall within the ranges specified on
page 19.
Summary of Contents for NPE-32AWE
Page 52: ...52 Appendixes 7 2 Technical Data Pressure Drop Curve NPE 24AWE 24SWE NPE 32AWE 32SWE...
Page 53: ...53 Appendixes Outlet Flow Data NPE 24AWE NPE 32AWE...
Page 64: ......
Page 66: ...Memo...
Page 67: ......