![Nautel NX5 Installation Manual Download Page 27](http://html2.mh-extra.com/html/nautel/nx5/nx5_installation-manual_3571001027.webp)
NX5/NX3 INSTALLATION MANUAL
CONNECTING AC POWER
VERSION 3.1 2021-04-22
PAGE 2.4.5
Table 2.4.1: Three-phase primary winding tap nominal voltages (rms, phase-to-phase)
Figure 2.4.4: Transformer Line 1, 2, 3 Terminal Hardware Orientation
Ac Power Source Voltage
Tap
200 - 250 V ac
360 - 505 V ac
N/A
360
7
200
380
6
208
400
5
220
415
4
230
440
3
240
480
2
250
505
1
TRANSFORMER
TERMINAL
(LINE 1, 2, 3)
M6 NUT
(HMN05)
FLAT
WASHER
(HM44)
BRASS
WASHER
(HMW53)
TERMINAL
LUG
(HAM94)
M6 FLAT
WASHER
(HMW05)
M6 SPLIT
WASHER
(HMW35)
M6 HEX
SCREW
(HMSH36)
COMPLETED
LUG INSTALLATION
INSERT
WIRE HERE
TRANSFORMER
STRAP
Summary of Contents for NX5
Page 2: ......
Page 4: ......
Page 8: ...NX5 NX3 INSTALLATION MANUAL PAGE 2 VIII VERSION 3 1 2021 04 22...
Page 32: ...NX5 NX3 INSTALLATION MANUAL ADJUSTING THE SPARK GAP PAGE 2 5 4 VERSION 3 1 2021 04 22...
Page 54: ...NX5 NX3 INSTALLATION MANUAL COMMISSIONING TASKS PAGE 2 8 12 VERSION 3 1 2021 04 22...
Page 58: ...NX5 NX3 INSTALLATION MANUAL PARTS AND TOOLS PAGE 2 9 4 VERSION 3 1 2021 04 22...
Page 69: ......