This section provides a list of tasks that you must perform prior to delivery and installation of the NX5
transmitter.
To prepare for installation of an NX5 transmitter, perform the following tasks:
1.
Ensure that the correct transmitter configuration is ordered. Check the ac power requirements,
preset frequency and other options. Complete and return the technical questionnaire provided by
your Nautel Sales Agent.
2.
Consider the method of shipping when placing an order. The standard “upright” configuration
allows the power transformer to remain in the transmitter cabinet for shipping. If space constraints
require another method of shipping, inform your Nautel Sales representative.
3.
Select a location for the transmitter in the transmitter room. Determine whether additional
heating, ventilating or cooling capacity is needed at the site. Identify any special requirements
regarding air flow around the cabinet (for example, ducting hot air away from the cabinet, or
bringing in external cooling air). See
“Selecting a Location for the Transmitter” on page 1.3.1
.
4.
If you are planning to anchor your transmitter against seismic activity, prepare the transmitter
room floor to accept four anchoring bolts. Four 5/8-inch (16 mm) holes are provided in the
transmitter floor to allow this (see
for hole location). Square washers are
provided in the ancillary kit to aid in anchoring the transmitter (see NX5 Installation Manual).
5.
If this is an upgrade or replacement transmitter (that is, if the site is already set up for a
transmitter), go to
. (If you are upgrading a site, verify the feedline, the lightning protection
systems, and the ac power service. Refer to Nautel’s
Recommendations for Transmitter Site
Preparation Manual.
)
6.
Install ac power service into the planned location of the transmitter, and select a location for an ac
power switch near the transmitter location. For detailed information, see
Be aware of lightning protection issues when installing ac power. Lightning protection is essential
to protect both personnel and equipment at your site. Refer to Nautel’s
Recommendations for
Transmitter Site Preparation Manual.
7.
Install a safety power interlock switch in series with the ac power service installed in
may provide an optional keyed interlock system that will meet this requirement.
WARNING! FAILURE TO COMPLY WITH RECOMMENDATIONS MAY VOID
YOUR MANUFACTURER’S WARRANTY. FOR MORE INFORMATION, REVIEW
YOUR WARRANTY DOCUMENTS.
Summary of Contents for NX5 AM
Page 2: ......
Page 4: ......
Page 8: ...NX5 PRE INSTALLATION MANUAL TABLE OF CONTENTS PAGE 1 VIII VERSION 0 1 2015 08 01 ...
Page 10: ...NX5 PRE INSTALLATION MANUAL PAGE 1 X VERSION 0 1 2015 08 01 ...
Page 22: ...NX5 PRE INSTALLATION MANUAL PAGE 1 XXII VERSION 0 1 2015 08 01 ...
Page 79: ...NX5 PRE INSTALLATION MANUAL PARTS AND TOOLS PAGE 1 9 4 VERSION 0 1 2015 08 01 ...
Page 85: ...NX5 PRE INSTALLATION MANUAL PRE INSTALLATION ASSISTANCE PAGE 1 10 6 VERSION 0 1 2015 08 01 ...
Page 88: ......