NX400 Installation Manual
Connecting transformer taps and secondary wiring
Page 4-4
Issue 1.0 2017-06-30
6. For each cabinet, remove the lexan cover over the ac terminals and connect the three-phase
wires to the
AC1
,
AC2
and
AC3
terminals (see
). Terminate all wiring
using the appropriate size Cytolok cable connectors (Nautel Part # JA93 for 535 MCM
wire), which are provided in the ancillary kit (see
for proper
installation techniques
).
7. Route the black, 1/0 AWG wire (for
Xo
Xo
connection
points on the side of the transformer (see
) and the top of cabinet 1,
down through its ac cable duct, to the
Xo
).
Ensure the wire is properly routed along the cable carrying system and passes through
appropriate holes in any cable tray interfacing junctions. Repeat for cabinet 3. Terminate all
wiring using the appropriate size Cytolok cable connectors (Nautel Part # JA92 for 1/0
AWG wire), which are provided in the ancillary kit (see
installation techniques
).
8. Route the green, 1/0 AWG wire (for ground) in
Secondary Cable Tray
GND
point on the side of the transformer (see
) and the
Xmtr Ref
Gnd
point on the top of the output cabinet (cabinet 3) (see
the wire is properly routed along the cable carrying system and passes through appropriate
holes in any cable tray interfacing junctions. Terminate the wire using the appropriate size
Cytolok cable connectors (Nautel Part # JA92 for 1/0 AWG wire), which are provided in the
ancillary kit (see
for proper installation techniques
).
9. Re-install the lexan covers removed in
.
10. Leave the transmitter
cabinets’ back doors open to allow for station reference ground
Section 5, “Connecting the station reference ground” on page
11. Reinstall the cover on the secondary side of the transformer cabinet. NOTE: You will need
to access the primary side of the transformer cabinet to allow for ac power connection in
Section 6, “Connecting ac power” on page 6-1
WARNING: DO NOT connect the X0 terminal of the power transformer
to ground. Connect as detailed in
.
Summary of Contents for NX400
Page 2: ......
Page 4: ......
Page 8: ...NX400 Installation Manual Page x Issue 1 0 2017 06 30...
Page 12: ...NX400 Installation Manual Preparing for installation Page 1 4 Issue 1 0 2017 06 30...
Page 22: ...NX400 Installation Manual Unpacking and positioning Page 2 10 Issue 1 0 2017 06 30...
Page 49: ...NX400 Installation Manual Connecting ac power Page 6 4 Issue 1 0 2017 06 30...
Page 53: ...NX400 Installation Manual Adjusting the spark gap Page 7 4 Issue 1 0 2017 06 30...
Page 75: ...NX400 Installation Manual Parts and tools Page 11 4 Issue 1 0 2017 06 30...
Page 88: ......