background image

Page 5

6. Architectural 

Drawings

6.1 

Example of Cavity Design - Section View

1.  Angle section for support fi xed to timber frame/fl oor using coach screws or ‘Dynabolts’ when fi xing to concrete.
2.  The joint for fi re rated board* and Plasterboard located over frame member must be stopped to manufacturer’s 

instructions.  Note: Wallpaper is not permitted on the front of the enclosure.

3.  Comply with all minimum distance to all combustible surfaces.  Any modifi cations to the dimensions shown to 

be verifi ed by consultation with the relevant Building Consent Authority.

4.  Ensure there is a minimum of 100cm

ventilation into the cavity (this does not need to be from the outside).

5.  Installers must ensure adequate vermin proof measures are incorporated into the cavity construction (if 

applicable).

*Ensure product being used is fi reproof rated above 80°C eg Micore, Supalux, Eterpan or similar

NOTES

*

~600mm

~648mm

~200mm

~300-580mm

12mm ‘Micore’ board*

12mm ‘Micore’ board*

Summary of Contents for Camino

Page 1: ...HIS ENTIRE MANUAL BEFORE INSTALLATION AND USE OF THIS WOOD PELLET FIRE FAILURE TO FOLLOW THESE INSTRUCTIONS COULD RESULT IN PROPERTY DAMAGE BODILY INJURY OR EVEN DEATH Contact your local building or fire official about restrictions and installation inspection requirements in your area Fire shown installed with a non combustible floor no hearth required ...

Page 2: ... fire requires technical programming and individualised air pressure adjustments to ensure it will operate safely and efficiently and to avoid possible damage to the fire or the home Installation of the Camino Wood Pellet fire by a non registered installer will void the warranty and may result in your local authority refusing to approve the necessaries permits If you require a registered Nature s ...

Page 3: ...wings 5 Example of Cavity Design Section View 5 Example of Cavity Design Top View 6 Adjusting the Support Frame 7 Seismic Restraint 7 Fixing to Concrete Floor 7 Fixing to Timber Flooring only 7 Fixing to Timber Floor Framing 7 Ventilation 7 Television Clearances 8 Flueing 8 Flashing Options 9 Controls and Menus 9 Description of Controls 9 Turning the Unit On 9 Menu Descriptions 10 Programming Comm...

Page 4: ...uirement appropriate measures must be taken i e a load distribution plate 2 Camino must be installed on a non combustible surface This surface must protrude a minimum of 150mm from the front of the closed pellet fire door and a minimum of 200mm from the side of the appliance Please note that if a floating hearth is to be installed an allowance must be made below the fire for installation of the ch...

Page 5: ...purities such as high salt content Wood pellets manufactured to the AS NZS 4014 6 standard are recommended Dirty fuel will adversely affect the operation and performance of the unit and will void the warranty The Pellet Fuel Industries PFI has established standards for wood pellet manufacturers We recommend the use of pellets that meet or exceed these standards Ask your dealer for a recommended pe...

Page 6: ...nt with the safety instructions Installation that is not compliant with the manual and regulations in force in the country Installation by personnel who are not qualified or authorised Modifications and repairs that are not authorized by the manufacturer Use of spare parts that are not original Exceptional events If you require further information please contact your Nature s Flame pellet fire dea...

Page 7: ... 580mm depending on height of support stand Internal Cavity Dimensions A Width 1200mm min B Depth 800mm min C Height 2200 2430mm Includes 110mm clearance from rear of flue spigot box Dependendent on height at which the support frame is set WALL WALL WALL WALL WALL WALL WALL WALL L N K M Additional Clearances to Combustibles K from exhaust spigot to cavity wall 110mm L from side of fire to cavity w...

Page 8: ...re 3 Comply with all minimum distance to all combustible surfaces Any modifications to the dimensions shown to be verified by consultation with the relevant Building Consent Authority 4 Ensure there is a minimum of 100cm2 ventilation into the cavity this does not need to be from the outside 5 Installers must ensure adequate vermin proof measures are incorporated into the cavity construction if app...

Page 9: ...nt of the enclosure 3 Comply with all minimum distance to all combustible surfaces Any modifi cations to the dimensions shown to be verifi ed by consultation with the relevant Building Consent Authority 4 Ensure there is a minimum of 100cm 2 ventilation into the cavity this does not need to be from the outside 5 Installers must ensure adequate vermin proof measures are incorporated into the cavity...

Page 10: ...ch screws Thickness of flooring must be 20mm minimum The flooring shall be fixed to the nearest joist with two 8g x 40 screws per hold down anchor 11 Fixing to Timber Floor Framing Minimum 14g x 60 screws 6 3 diameter or M10 x 90 coach screws These shall be fixed a minimum of 40mm into the centre line of the existing floor joists If screws cannot be installed directly into an existing floor joist ...

Page 11: ...inimum clearance if lined flue 150mm minimum Part No Description Quantity 1 Galvanised outer liner Ø100mm x 900mm long 4 2 Stainless steel inner liner Ø75mm x 900mm long 4 5 Inner outer flue liner spacer 4 8 Rain cap 75mm 1 9 Rain cap 100mm 1 702 Support Angle 950mm Long 2 55 Ecoteck Sara Camino new home non Chimney installation Each 54 1 Built in Heater Flue Kit Chimney installation contains This...

Page 12: ...ng Power P6 Multifunction Button P7 Multifunction Button 16 2 Turning the Unit On 1 Ensure burn pot is clean and free of ash 2 Slide the heat exchange cleaner in and out three times 3 To turn unit on hold down button 3 ON OFF 4 Control Screen will show START 5 To change the Power setting first press P5 then use buttons P1 or P2 to adjust the heat output of the fire 6 To change the Thermostat Setti...

Page 13: ...m 7 TIME CLOCK will appear on the display and the current time will be shown Change the hours of the day with 1 or 2 24 hour clock example 4 30p m would be 16 30 8 Press 7 to confirm 9 MINUTES CLOCK will appear on the display Change the minutes of the day with buttons 1 or 2 10 Press 7 to confirm 11 Press 3 to exit the menu 16 3 2 Menu Three Select Language Setting the Language Some fires may be i...

Page 14: ... will run for a couple of minutes 4 Remember to turn the screw OFF SCREW 0 with button 2 before exiting button 3 5 Empty the burner pot of any pellets before starting the fire Also see 16 3 4 Menu Five Stove State Fire Status on page 11 16 3 7 How to synchronise the remote control with the fire All insert stoves are fitted with remote control radio wave handset and a receiver located on the right ...

Page 15: ...ower 1 PR06 Sec 1 3 Screw power 2 PR07 Sec 1 8 Screw power 3 PR08 Sec 2 2 Screw power 4 PR09 Sec 2 7 Screw power 5 PR10 Sec 3 2 Re start threshold PR11 C 80 No pellet threshold PR12 C 50 Off threshold PR13 C 45 Maximum threshold PR14 C 250 Fan threshold PR15 C 90 Smoke ignition PR16 RPM 2100 Ignition smoke speed PR17 RPM 1950 1 smoke speed PR18 RPM 1250 2 smoke speed PR19 RPM 1450 3 smoke speed PR...

Page 16: ...limate PR42 on off OFF Fan 2 speed 1 PR43 V Fan 2 speed 2 PR44 V Fan 2 speed 3 PR45 V Fan 2 speed 4 PR46 V Fan 2 speed 5 PR47 V Draft setting PR48 on off OFF or for version Air 03 Screw encoder PR49 on off OFF Magnehelic on high WG 0 11 Comments These pages 12 13 must be returned to Nature s Flame PO Box 11 043 Sockburn Christchurch 8443 ...

Page 17: ... Green Yellow Green Yellow Green 7 8 11 12 9 10 3 4 Brown Brown Yellow Green Brown 10 9 Brown Blue Yellow Green Black Blue Blue Brown 1 6 6 5 5 6A 5A 1 2 2 6 Encoder Red Black White Black Brown White 7 8 Ambiant temperature sensor NOT SUPPLIED Clock Motherboard Cod I023 9 Flat cable 3 4 Black Black Microswitch 7 SERIAL White Black Red TERRA Switch Rear view ...

Page 18: ......

Page 19: ...QFH KDV EHHQ LQVWDOOHG DQG FRPPLVVLRQHG LQ FRPSOLDQFH ZLWK 0DQXIDFWXUHU V QVWDOODWLRQ UHTXLUHPHQWV DQG DSSURSULDWH 1HZ HDODQG 6WDQGDUGV RFDO RXQFLO UHTXLUHPHQWV Signed Date Declaration by Owner KHUHE FHUWLI WKH DERYH SDUWLFXODUV DUH WUXH DQG FRUUHFW DQG WKDW P 7HFKQLFLDQ KDV GHPRQVWUDWHG WR PH WKH FRUUHFW RSHUDWLRQ RI P SSOLDQFH Signed Date Christchurch Only V WKH KRPH RZQHU DJUHH WR WUDQVIHU WR W...

Page 20: ...inspiring people to love the experience of sustainable wood pellet heat 0800 PELLET 0800 735 538 info naturesflame co nz www naturesflame co nz Nature s Flame PO Box 11 043 Sockburn Christchurch NZ ...

Reviews: