Installation and Operating Instructions
NCB
Built Like A Tank With Laser Precision
Page
28
of 29
B. Difficult to Start a Fire.
Not Enough Air
: Make sure that fan is on or open the ash pan door (approx. 1 inch
gap).
Bad Kindling:
Use small pieces of split kindling together with crumbled
newspaper, and add larger pieces. Remember: The smaller the
better, the dryer the better.
Down Draft/
Cold Chimney:
Heat up the chimney by twisting some newspaper into a torch and
hold it up into the stove until the draft is reversed.
VII. Disclaimer
All installation and operation must follow Federal, Provincial, State and Local codes,
ordinances and laws.
The Nature’s Comfort boilers are not intended to be used in urban areas.
The Nature’s Comfort boiler is not intended to be the only source of heat. Therefore, a
backup system should always be in place and be ready for use.
The Nature’s Comfort boiler
is not intended
to operate under pressure.
All electrical and plumbing should be done by qualified personnel and conform to
national, state and local building, electrical, plumbing, fire and building codes.
Manufacturer is not liable for damages to personnel or property for misuse, improper
installation of equipment or for knowing Federal, Provincial, State and Local codes,
ordinances and laws including local installation codes.
Owner assumes all responsibility for this.
Please keep this manual with all other important papers. The information in this manual is
necessary for the installation, operation and proper use of this boiler. If you should ever have a
problem or question please refer to this manual or have it available when you call Nature’s Comfort
Company
.