NL3
OWNER’S MANUAL
AUS | NZ
ecoflo.com.au
IMNL-010-2024-01-08
Page 1: ...NL3 OWNER S MANUAL AUS NZ ecoflo com au IMNL 010 2024 01 08...
Page 2: ...ITEMS NOT INCLUDED 3 TOOLS REQUIRED 4 NL3 INSTALLATION OPTIONS 4 NL3 INSTALLATION INSTRUCTIONS 5 POWERING THE FAN 9 EXCESS LIQUID DRAIN 10 USING THE NL3 11 HOW COMPOSTING WORKS 12 COMPOST ACCELERATOR...
Page 3: ...LIED FAN IN HOUSING L I T REDUCER PIPE BRACKET NOT SUPPLIED DWV PIPE NOT SUPPLIED OUTLET PIPE TO ABSORPTION TRENCH SPECIFICATIONS Capacity 2 person full time use Max Load Bearing 130kg Material LDPE D...
Page 4: ...MOUNTING BLOCKS TOILET ROLL 50MM WALLACE SEAL CHAMBERS VENT COWL 12V TRANSFORMER 90 50MM DWV BEND REDUCER HOSE TAIL HOW TO USE SIGN WHAT S IN THE BOX ENZYMES MICROBES 25mm SULLAGE HOSE PEDESTAL WITH...
Page 5: ...ircumstances of your installation you may require the following items TRENCH ARCH DRAIN FOR THE EXCESS FLUID DRAIN AGI DRAIN WITH SOCK GRAVEL A Drain Kit can be purchased from ecoflo com au FOR THE VE...
Page 6: ...e vent pipe exiting directly through the rear wall See OPTION 1 Alternatively the vent pipe can be installed on the inside exiting up through the ceiling See OPTION 2 This must be indicated at the tim...
Page 7: ...24 01 08 ecoflo com au PH 1300 138 182 Mark holes on rear wall with pencil Ensure the hole is sloping downwards to the outside SIDE VIEW BACK VIEW NL3 INSTALLATION INSTRUCTIONS 1 2 Drill 38mm hole Dri...
Page 8: ...com au PH 1300 138 182 DWV Pipe Sullage Hose Hose tail Insert rubber wallace seal use soapy water if difficult to insert Feed vent pipe sullage hose through the wall Ensure the hose end point is lower...
Page 9: ...7 IMNL 010 2024 01 08 ecoflo com au PH 1300 138 182 Cut PVC if required Connect the 90 DWV Bend and the Reducer to the DWV Pipe OUTDOOR VIEW Secure pedestal to wall with mounting blocks 5 6...
Page 10: ...8 IMNL 010 2024 01 08 ecoflo com au PH 1300 138 182 Connect the Fan Housing to the Reducer Min 600mm 7 8 9 Installation complete...
Page 11: ...d run 24 hours a day to continuously circulate air through the compost heap Connect the fans to the transformer as follows 1 3 5 2 4 6 Unscrew the fan housing cover Attach the transformer cables to th...
Page 12: ...d permeability and in a position where ground water will not flood the unit 3 If there is some doubt as to the permeability of soil extra trenching length may be required especially if a hand basin or...
Page 13: ...compost will be kept porous and moist and the supply of oxygen will increase which substantially speeds up the transformation of waste materials into humus Bulking material Hemp wood shavings or othe...
Page 14: ...hing includes gloves appropriate footwear a face mask and eye protection You should dispose of the composted waste in accordance with any and all local authority regulations For an on site burial of c...
Page 15: ...weekly basis The bulking agent can be added through the pedestal For best results use pine wood shavings or hemp bedding available to purchase from Ecoflo or find at your local hardware or pet store W...
Page 16: ...Check if the drainage outlet is being blocked If drainage outlet is okay this could be caused by prohibited solids blocking the perforated holes in the floor of the compost chamber Insufficient air f...
Page 17: ...ing Always place a layer of bulking agent over the top of the pile in the out of service chamber to eliminate the possibility of insects laying eggs WARRANTY Pedestal 10 years warranty Any damage caus...
Page 18: ......