background image

©Ecoflo Wastewater Management Pty Ltd

IMNL-009-2023.04.28

Page 6

EXTRA LENGTH REQUIRED FOR UNDER-FLOOR AREAS

If the underfloor height exceeds 900mm (floor-to-floor), you will require additional lengths of chute, 
fixed together with small stainless steel self-tapping screws below the flange of the additional waste 
chute.

As the chute joints are tapered, the top waste chute must be inserted through the toilet room floor 
first with additional waste chutes added from below.

STEP 4: INSTALL THE WHEELS

Attach the wheels to the ends 
of the axle and place under the 
chamber.

Summary of Contents for CLASSIC 650

Page 1: ...NATURE LOO CLASSIC 650 INSTALLATION OPERATION MANUAL IMNL 009 2023 04 28 Ecoflo Wastewater Management Pty Ltd...

Page 2: ...EXTRA LENGTH REQUIRED FOR UNDER FLOOR AREAS 6 STEP 4 INSTALL THE WHEELS 6 STEP 5 INSTALL THE COMPOST CHAMBER 7 STEP 7 CONNECT THE VENT PIPE AND FAN 8 OPTIONAL EXTRAS 8 STEP 7 CONNECT THE FLEXIBLE VEN...

Page 3: ...coflo within 72 hrs of receipt You will need the following items to complete your installation Vent items Wall brackets to fix the vent pipe to the building A length of 100mm DWV vent pipe to connect...

Page 4: ...fittings Excess liquid drain hose Moisture trap Leachate drain NATURE LOO CLASSIC 650 SCHEMATICS If you are planning to excavate an area under the house for the compost chambers please ensure the are...

Page 5: ...e pedestal to go before cutting the hole The usual position for pedestals is centred between side walls NOTE Due to the pedestals being man made the distance to the centre may vary from 245 to 255mm P...

Page 6: ...u have drilled Check to see if there is a floor joist water pipe or electrical wiring under the area you are going to cut If there is a joist in the way either reposition the waste hole OR install tri...

Page 7: ...8 Page 5 STEP 3 INSTALL THE WASTE CHUTE First ensure the pad or ground level on which the In service chamber will reside is at its final level beneath the toilet room Insert the chute into the hole Ma...

Page 8: ...ditional lengths of chute fixed together with small stainless steel self tapping screws below the flange of the additional waste chute As the chute joints are tapered the top waste chute must be inser...

Page 9: ...sive cover and place the brush seal on the inside surface of the lid as shown below 2 Add 50mm depth of bulking agent to the chamber to create a bed 3 Slide the In service compost chamber lid with pre...

Page 10: ...ough the compost heap Air is drawn down the toilet pedestal through the compost chamber and out the vent pipe 100mm DWV vent kit 100mm DWV Pipes 100mm DWV Slip Joiners 100mm Stand Off Brackets Dektite...

Page 11: ...RAIN HOSE Liquid Drain Outlet See image 2 Air Vent Outlet Screw the 50mm MI connector into here See image 1 1 2 MI Connector Slotted Pipe Connector Flexible Vent Pipe Female Camlock Nipple Male Barbed...

Page 12: ...ulated transformer is included to run the fan from mains power The positive wire the transformer is marked with a white line The fan has anti polarity protection and would not run if connected incorre...

Page 13: ...wish to construct your own leachate drain The liquid drain hose should run into either a 50mm PVC pipe drilled to allow liquid to escape OR a length of socked slotted Ag pipe buried in an absorption t...

Page 14: ...daily or weekly basis The bulking agent can be added through the pedestal We do NOT recommend the use of Sawdust as it creates an anaerobic condition within the chamber Cypress cedar or eucalyptus woo...

Page 15: ...o toilet after every solid use Monthly Inspect the In service chamber depends on usage prepare another In service chamber for use once the chamber becomes full refer to Rotation of Chambers page 13 Ch...

Page 16: ...ore removing the full chamber Extra Chamber s The Out of Service chamber should be put in a warm position with the Air Intake Cap attached to threaded connector and the dust plug attached to the camlo...

Page 17: ...er and thoroughly flush out the contents of the liquid chamber ANTIBIOTICS AND DISINFECTANTS WILL SLOW DOWN OR STOP THE PROCESS Restart the composting by reintroducing microorganisms In many of these...

Page 18: ...The odour from the in service chamber is unpleasant If this is not caused by a failed fan or blockage in the vent pipe liquid drain hose or fitting please see the In service chamber is filling too qui...

Page 19: ...r to follow normal installation and operating procedures outlined in the manual or in any other printed instructions supplied with the system Labour and service charges incurred in the removal and rep...

Page 20: ...complete the table as you rotate your chambers Model ______________ Date First Put into Service _____ _____ ________ The Out of service chamber must compost for a minimum of 6 months from the date it...

Page 21: ...Ltd IMNL 009 2023 04 28 Page 19 Proudly Designed and Assembled in Australia by Ecoflo Wastewater Management Ecoflo Wastewater Management Pty Ltd ecoflo com au natureloo com au Phone 1300 138 182 07 3...

Page 22: ......

Reviews: