NOTES: Please check for any damage caused by the shipping company and take appropriate steps 
to file a claim, if needed.

*Please call 

Digsafe

 and check for any underground utilities before digging anywhere.

Materials needed

Cordless drill/driver, T25 bit, 5/16” or 8mm nut driver bit, post hole shovel, spade shovel, level, tape measure, 
hand tamp, 6’ ladder, and thirty two (32) 50lb bags of fast-setting premixed concrete (not included).  Concrete 
amount required may very depending on how deep you can get the holes.  Concrete amounts can be easily 
calculated at 

http://www.quikrete.com/Calculator/Main.asp

Instructions

1. Remove items from pallet or packaging.  You should find four (8) shiplapped (L-notched) 4x4 post halves 

(the four top post halves are longer than the four bottom halves), two (2) railing sections, two (2) post joists, 
three (3) main joists, five (5) top joists, four (4) trim pieces, and one (1) package of hardware. 

*Note:

  It is recommended to assemble the Arbor Swing on flat ground (such as a parking lot), then 

be carried to desired installation location.   All pieces are labeled for easy assembly.

2. Attach the four sets of shiplapped (L-notched) post halves together with the 3” lag screws provided, 

screwing three (3) screws per post through the predrilled holes to assemble the four posts. 

3. Now you’ll attach the railing sections to the posts.  Insert the railing section into the two notches, located 

toward the center of the post, on both of the corresponding posts.  The end of the railing should be flush with 
the end of the post, and line up with the pre-drilled holes as show in image 1 on page 4.  Do this for both of 
the railings.

4. Now you should have two sets of posts attached to railings that we’ll refer to as the two post assemblies 

(post assembly 1 and 2).  Lay the post assemblies on the ground with the railing blasters facing up.  Insert 
the post joist into the notch, located toward the top of the post, on both posts.  Do this for both post 
assemblies.

5. Lay both post assemblies on their sides, so the posts in each assembly align vertically as shown in image 2 

on page 4.  Attach the end main joist to the posts on post assembly 1 and 2, lining it up with the markings 
and predrilled holes.  Flip the arbor swing assembly over and repeat this step installing the other end main 
joist.

6. Stand the arbor swing assembly upright and assemble the middle main joist and the top joists using a ladder 

to reach.  We’ll install the trim pieces and the swing once the arbor swing assembly is installed in the 
ground.

7. Move arbor swing assembly to desired location.  Position the assembly so the posts are close to the location 

you want and mark the location of the post bottoms, referencing the foundation plan on page 4.

8. Move the arbor swing assembly away from marked locations to give you room to dig post holes, using a 

post hole shovel, post hole digger, or auger bit.