background image

Natural Bed Company 

 

168-170 Devonshire Street, Sheffield, S3 7SG. T: 0114 272 1984 

[email protected]                          www.naturalbedcompany.co.uk 

  

 

 

3.

 

Attach the side rails to the footboard panel (see images on the previous 

page), then loosely secure using the half-moon washer and the nut with the 
spanner provided (see image below). In the same way attach the side rails to 

the headboard to create a full bed frame. 
 

   

 

 

4.

 

Ensure the frame is ‘square’ then fully tighten all of the nuts with the spanner. 

 

5.

 

Lower the centre rail onto the brackets and push down firmly into position –

see second image above (unless you have ordered a single bed; these do not 

come with a centre rail) 

 

NB: If you have ordered side tables: Present the table to the 
headboard and pass the bronze bolts through the headboard from the back 

and into the table (there are numbers stamped into the edge of the table and 
the bed frame – match the numbers). Tighten with the small hexagon key. 

Pass the bolts through the side rail, from inside the frame, into the table and 
tighten. Repeat this process for the other side table. 

 

 

 

6.

 

Attach the end caps to the sprung slats (see image below): an end-cap slots 

on to each end of the slat (ensure the slat curves up in the in the middle and 
the ‘peg’ on the end cap points downwards.) 

Reviews: