
Chapter 2
System Setup
©
National Instruments Corporation
2-3
PPC-2115/TPC-2515 User Manual
2.
Connect the power connector to 24 VDC power lines. Be sure
to connect the positive, negative, and ground lines as shown in
Figure 2-1. The power lines can be from either a power adapter or
in-house power source.
Figure 2-1.
Power Connector
3.
Connect the power connector to the power receptor on the
PPC-2115/TPC-2515. The power receptor pin assignment is shown in
Figure 2-2.
Figure 2-2.
Power Receptor and Pin Assignment
4.
Press the power button to power on the system.
Touchscreen Calibration
The PPC-2115/TPC-2515 touchscreen should be correctly calibrated and
ready to use when you power on the system. However, if the calibration is
not correct or you want to choose custom calibration options, refer to
Appendix E,
Touchscreen Configuration
.
+
–
GND
GND
–
+
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com